Date: | 10 07 1927 |
---|---|
Description: | Three-quarter view from front left of a man driving a Farmall tractor pulling a lime spreader in a field. A man is standing in the lime spreader holding a ... |
Date: | 10 07 1927 |
---|---|
Description: | Two men are holding with shovels to spread a pile of lime in a field. Behind them is a Farmall tractor pulling a lime spreader. |
Date: | 10 07 1927 |
---|---|
Description: | Three-quarter view from right rear of a man driving a Farmall tractor pulling a lime spreader in a field. A man is standing in the lime spreader holding a ... |
Date: | 04 24 1936 |
---|---|
Description: | Men are working on a project at the State Fish Hatchery. There is new concrete lining a raceway in the foreground, where a man is working on the floor. Woo... |
Date: | 06 19 1936 |
---|---|
Description: | One man is working on a ladder near the side door of a one and one half story, masonry block building with five garage bays. There are two men on the right... |
Date: | 06 1936 |
---|---|
Description: | Elevated view of a man, on the left, approaching three youths working on the Thunder River. One of the youths is holding a bucket while the others, standin... |
Date: | 1935 |
---|---|
Description: | One man is sighting a transit level, and another man is holding a round metal post as a crew of six people "sets a corner" in a Jackson County forest. Ther... |
Date: | 1935 |
---|---|
Description: | A large crew of men are bending to their work of planting seedling trees into furrows. Each man is carrying a spade-like tool with a long handle, and a box... |
Date: | |
---|---|
Description: | View of workers and supervisors during construction of the skywalk across Baldwin Street at the Gisholt plant. The floor is covered in plastic. The renovat... |
Date: | |
---|---|
Description: | Construction site showing men excavating the foundation and basement of a building. Teams of horses are hitched to wagons. The men are using various implem... |
Date: | |
---|---|
Description: | A construction site with a view of the excavated foundation and the street level. At the street level are buildings, people, and horse-drawn wagons. One ma... |
Date: | 10 01 1928 |
---|---|
Description: | A man is standing at the front of a truck parked on a ramp. Further back on the right a group of men are working laying asphalt with large machinery. A gro... |
Date: | 1948 |
---|---|
Description: | View down sidewalk along Washington Street facing east. Excavation is going on between S. 8th and S. 9th Streets. A crew is mixing concrete and doing work ... |
Date: | 1948 |
---|---|
Description: | Crews of the Vinton Construction Co. are laying a 20 foot wide concrete slab in front of the northeast corner of Washington and S. 9th Streets. A truck is ... |
Date: | |
---|---|
Description: | View down railroad tracks towards two men working near the entrance to a tunnel. The man on the left is using a pick, the other man is using a shovel. Wate... |
Date: | |
---|---|
Description: | Stereograph of a railroad crew laying tracks. The ties are in place and the rails are being positioned on the first level. The bank behind the crew is terr... |
Date: | 1880 |
---|---|
Description: | Stereograph of men posing with ore carts on railroad tracks. One man is standing on the dirt in the cart to the right. They are possibly excavating more di... |
Date: | 05 2000 |
---|---|
Description: | Lou Host-Jablonski, AIA architect, preparing the new concrete foundation for the "Blue Dragon Urn," which was relocated from Sid Boyum's backyard to the pu... |
Date: | 1910 |
---|---|
Description: | With shovels in hand, a man, woman, and boy are digging a hole in the ground for a flag pole. One young man is holding the pole in place with two hands. A... |
Date: | 08 23 1928 |
---|---|
Description: | View towards a truck parked near a house, with a man sitting in the driver's seat. The side yard is a construction site. A man is working in the yard among... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: