Date: | |
---|---|
Description: | A wagon is being raised or lowered at a construction site. The wagon has chains looped around the axle of each wheel as a man below signals directions. He ... |
Date: | |
---|---|
Description: | A construction site with a view of the excavated foundation and the street level. At the street level are buildings, people, and horse-drawn wagons. One ma... |
Date: | |
---|---|
Description: | A construction site with a view of the excavated foundation and the street level. At the street level are buildings, people, a crane, construction shacks, ... |
Date: | |
---|---|
Description: | A construction site with a view of the excavated foundation and the street level. At the street level are buildings, people, a crane, construction shacks, ... |
Date: | 10 18 1928 |
---|---|
Description: | View across field towards a plant under construction. There are automobiles parked on the far left, and a tower rising in the background has a sign for "In... |
Date: | 1930 |
---|---|
Description: | Construction site of the Wisconsin Power and Light Co. Office Building & Bus Station. The address of the bus station was 122 West Washington Avenue, but th... |
Date: | 1962 |
---|---|
Description: | Aerial view of the Hill Farms State Office Building, 4802 Sheboygan Avenue, during construction. |
Date: | |
---|---|
Description: | A State Office Building construction site, downtown, with a view of the Wisconsin State Capitol. Two men on the right are working with boards on sawhorses.... |
Date: | 08 12 1955 |
---|---|
Description: | Reverend Monsignor Francis Leo McDonnell, pastor, poses in front of the new Our Lady Queen of Peace Catholic Church located at 401 South Owen Drive. The st... |
Date: | 04 03 1962 |
---|---|
Description: | View looking south from the Shorewood bluff of the Hilldale Shopping Center under construction. Apartments and houses in the Hill Farms neighborhood are in... |
Date: | 10 18 1928 |
---|---|
Description: | View towards a plant under construction. |
Date: | 10 04 1926 |
---|---|
Description: | Interior view of Orpheum Theater construction, 216 State Street, from upper balcony. A man is standing on top of scaffolding in the center. Below him coats... |
Date: | 06 17 1958 |
---|---|
Description: | The new St. Patrick's parish center, 404 East Main Street, under construction. The designing architect is Charles A. Woehrl. |
Date: | 03 1913 |
---|---|
Description: | A view looking toward the Atlantic entrance to the Panama Canal, over the Gatun Locks during construction. The entrance lighthouse is seen in the distance.... |
Date: | 07 25 1958 |
---|---|
Description: | View towards the exterior of a two-story addition to Hoyt School (on Regent Street near Hoyt Park). There are mounds of ground rubble near trees, and a car... |
Date: | 08 16 1958 |
---|---|
Description: | Construction work begins for the new school next to St. James Catholic Church. The two-story structure will include 12 classrooms and a gymnasium. |
Date: | 08 20 1958 |
---|---|
Description: | The new Catholic Parish Center adjoining the newly redecorated St. Patrick's Church on east Main street. The two-story building will contain rectory office... |
Date: | 1935 |
---|---|
Description: | An elevated, panoramic view of the construction of the Norris Dam. Portions of the image are labeled. |
Date: | 05 23 1936 |
---|---|
Description: | Elevated, panoramic view across water towards the Norris Dam. Portions of the image are labeled. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: