Date: | 1868 |
---|---|
Description: | View from unpaved Wisconsin Avenue looking east toward the third Wisconsin State Capitol sometime prior to the completion of the dome (1869). The portion o... |
Date: | 09 25 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, looking towards a chain link fence and gate surrounding the plant. R... |
Date: | 10 09 1929 |
---|---|
Description: | A Chicago & North Western Railroad Bucyrus crane installing a large tank at a Carbide & Carbon Chemicals Company Pyrofax plant, at 130 Fair Oaks Avenue. |
Date: | 1926 |
---|---|
Description: | View across W. Johnson Street towards the back side of the Orpheum Theater under construction at 216 State Street. The house beside the theater on the left... |
Date: | |
---|---|
Description: | Two men are leaning on a fence in the foreground, with other men behind them in a field. Men on scaffolding and ladders are building a barn with a cupola. ... |
Date: | |
---|---|
Description: | Pencil sketch, drawn by Frank Lloyd Wright, possibly of a wooden privacy fence. The sketch shows an elevation and a site plan. |
Date: | 1916 |
---|---|
Description: | A building site at 11 West Main Street, next to Gamm's Jewelry Store and Cop's Cafe. Power lines are in the alley in the background. |
Date: | 07 15 1952 |
---|---|
Description: | Two unidentified "sidewalk superintendents" observe the excavation for the new Wolff, Kubly and Hirsig Company building being constructed on the North Carr... |
Date: | 08 29 1930 |
---|---|
Description: | View from top of new bridge of construction grounds at the bridge site. There are cars carrying building materials on the railroad tracks by the Bridgeport... |
Date: | 1900 |
---|---|
Description: | Men use teams of horses to excavate a lot to be used as the site for the future McCormick Twine Mill. |
Date: | 1897 |
---|---|
Description: | View towards front entrance of the partially constructed Senior High School. A man is walking up a board into the open doorway of the school. A horse is st... |
Date: | |
---|---|
Description: | Group of men working on a barn raising, showing some of the workers up on the frame securing the timbers, and other workers carrying more timbers into posi... |
Date: | |
---|---|
Description: | The hole for the new silo on the William Fiebelkorn farm. A pole marks the center. There is a barn on the left with a stone foundation. In the background a... |
Date: | 11 21 1961 |
---|---|
Description: | Demolition of part of the Madison General hospital building to make way for the new psychiatric-rehabilitation wing. |
Date: | 1904 |
---|---|
Description: | Men working on the reconstruction of the fourth Wisconsin State Capitol (third in Madison) after the 1904 fire. |
Date: | 1950 |
---|---|
Description: | Slightly elevated view of work site near the church building. |
Date: | 04 24 1964 |
---|---|
Description: | Image shows an empty lot on the 400 block of State Street across from Ella's Deli (425 State Street). In the lot are remnants of basement walls and brick r... |
Date: | 1970 |
---|---|
Description: | Elevated view of Sid Boyum's background taken from the second floor of his house. There is a large arch in the center with wind chimes hanging on it. Shrub... |
Date: | 08 28 1914 |
---|---|
Description: | View looking uphill towards a factory building under construction. A brick chimney is near a tall metal tower on the left side of an open steel or iron str... |
Date: | 09 25 1914 |
---|---|
Description: | View of buildings at construction site, with an older building on the left, and on the right a building under construction. Men are standing in the backgro... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: