Date: | 1950 |
---|---|
Description: | People gather around a table of food for the First Unitarian Society's "Work Day". The building was designed by Frank Lloyd Wright and some of the construc... |
Date: | 1969 |
---|---|
Description: | Workers entering the construction area for the World Trade Center at the start of the work day. |
Date: | 05 18 1959 |
---|---|
Description: | As part of the "Outdoor Living Day" event, sponsored by the Madison Chamber of Commerce, model Marlyn Sachtjen reclines on an inflated beach mattress in th... |
Date: | 04 23 1970 |
---|---|
Description: | Four workers amid construction of food stalls out of plywood a day or two before the beginning of the Sound Storm music festival. |
Date: | 05 18 1959 |
---|---|
Description: | Model Marlyn Sachjen being helped out of the temporary pool which had been constructed on Capitol Park at the head of State Street. She had been modeling s... |
Date: | 05 18 1959 |
---|---|
Description: | Model Marlyn Sachtjen paddling around in the 16 by 32 foot pool which was constructed on the Capitol Park overlooking State Street. Ruth Andres sits at the... |
Date: | 06 29 1938 |
---|---|
Description: | A man operates an International PD-80 power unit mounted on a suction dredge for sand and gravel. The power unit is owned by Roy Deringer of Ithaca, Michig... |
Date: | 1910 |
---|---|
Description: | Six men in work clothes posing near a porch of a house under construction. Hollow core concrete blocks, most likely manufactured on site with local sand an... |
Date: | 03 1932 |
---|---|
Description: | A shovel unloads boulder pieces into the back of an International truck during the construction of the Hoover Dam. |
Date: | 1950 |
---|---|
Description: | Three-quarter view from left rear of a man driving a TD-18 crawler tractor. Subject: "TD-18 — Road Maintenance." Where Taken: "NE." Information with photo... |
Date: | 1932 |
---|---|
Description: | Men stand along a riverbank as International trucks are used to haul loads from the cliffs during the construction of the Hoover Dam. An electric shovel is... |
Date: | 03 1932 |
---|---|
Description: | Men use International trucks to loads from the cliffs during the construction of the Hoover Dam. One of the men is smoking a cigarette. Two shovels are wor... |
Date: | 03 1932 |
---|---|
Description: | Men use shovel to load boulder pieces, removed from the walls of Black Canyon with dynamite, into the back of an International truck during the constructio... |
Date: | 1909 |
---|---|
Description: | Close-up of the demolition of the dome of the Third Capitol, one of the few known photographs that permits such close observation of the architectural deta... |
Date: | 09 29 1950 |
---|---|
Description: | A group of skilled workmen in front of the First Unitarian Society meeting house on one of the work days they donated to the project. The building was desi... |
Date: | 1949 |
---|---|
Description: | Men using an Adams #5 1/2 Road Grader to work on an urban street. The grader was owned by the State Paving and Construction Co. Original caption states: "G... |
Date: | 1950 |
---|---|
Description: | Subject: "TD-24 — Pipe Lines." Where Taken: "SW." Information with photograph reads: "Owned by Morrison Bros., Odessa, Texas. These machines are used for s... |
Date: | 1950 |
---|---|
Description: | Subject: "TD-24 — Pipe Lines." Where Taken: "SW." Information with photograph reads: "Owned by Morrison Bros., Odessa, Texas. These machines are used for s... |
Date: | 1950 |
---|---|
Description: | Subject: "TD-24 — Pipe Lines." Where Taken: "SW." Information with photograph reads: "Owned by Morrison Bros., Odessa, Texas. These machines are used for s... |
Date: | 1883 |
---|---|
Description: | The third Wisconsin State Capitol after the unfinished South Wing collapsed on November 8, 1883. Defective workmanship and shoddy construction materials ca... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: