Date: | 08 01 1930 |
---|---|
Description: | Basement and ground floor of State Office Building, 1 W. Wilson Street, under construction. View toward Lake Monona. |
Date: | 03 28 1929 |
---|---|
Description: | Men working on the concrete forms for the roof of the addition to the University of Wisconsin hydraulics laboratory, 660 N. Park Street looking north over ... |
Date: | 03 28 1929 |
---|---|
Description: | Elevated view from the south east of men constructing the concrete forms for the roof of the addition to the University of Wisconsin-Madison hydraulics lab... |
Date: | |
---|---|
Description: | The head gate at the Big Horn Ditch on the Crow Reservation in northeast Wyoming. Men are working with cranes near a tent with a chimney spewing out smoke. |
Date: | 1932 |
---|---|
Description: | View of the bridge under construction, with a crane atop the structure. Eight men are standing on scaffolding below the bridge. The Nicolet Paper Company ... |
Date: | 03 1911 |
---|---|
Description: | Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are in the distance. |
Date: | 11 02 1912 |
---|---|
Description: | Workmen using a crane to erect the gate guides for the power house. |
Date: | 05 31 1912 |
---|---|
Description: | Workers maneuvering a load of gravel into a concrete mixer at the plant on the east bank of the river. The east abutment is in the foreground, left. |
Date: | 10 04 1946 |
---|---|
Description: | Men work with an International TracTracTor (crawler tractor) in construction of the Merriman Dam. The tractor was owned by S.A. Healy Co., White Plains, Ne... |
Date: | 08 10 1973 |
---|---|
Description: | View across water of early construction of the bridge over Little Lake Buttes des Morts. |
Date: | 1931 |
---|---|
Description: | View from shoreline of a crane lifting machinery to workers at the top of the bridge during construction. Words on the crane reads, "Stevens Brothers and S... |
Date: | 1931 |
---|---|
Description: | The entrance to the bridge during construction. A worker works on the side of the bridge on the right. Other workers in the middle of the bridge lay boards... |
Date: | 10 1927 |
---|---|
Description: | View along shoreline of construction of the New Free bridge. Men work on and below the wooden bridge, which is partially constructed. A crane is on the bri... |
Date: | 1935 |
---|---|
Description: | Elevated view of International trucks as they perform heavy-duty jobs while working near the Bonneville Dam. |
Date: | 1929 |
---|---|
Description: | An International truck pours 30-foot sections of a lock. |
Date: | |
---|---|
Description: | View from railroad tracks towards industrial activity on the edge of the river, possibly building a dam. |
Date: | 1925 |
---|---|
Description: | A building site with "O'Dea and Shafer, Engineers and Contractors" construction crew, crane and other equipment. On the photograph album binding on the lef... |
Date: | 1925 |
---|---|
Description: | Elevated view of a building site with "O'Dea and Shafer, Engineers and Contractors" construction crew, crane and other equipment. On the photograph album b... |
Date: | 1925 |
---|---|
Description: | Elevated view of a building site with "O'Dea and Shafer, Engineers and Contractors" construction crew, crane and other equipment. On the photograph album b... |
Date: | 1950 |
---|---|
Description: | View towards a man driving a TD-24. In the background are cranes, and a ship at the shoreline. Subject: "TD-24 — Material Handling." Where Taken: "MW." Inf... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: