Date: | 01 29 1946 |
---|---|
Description: | Schoelkopf Manufacturing Company, 320 North 3rd Street, between East Johnson Street and Pennsylvania Avenue. Louis Schoelkopf invented and manufactured the... |
Date: | 09 07 1930 |
---|---|
Description: | University of Wisconsin-Madison Mechanical Engineering Building at 1513 University Avenue under construction. Men are working on the steel framework. A mas... |
Date: | 10 11 1928 |
---|---|
Description: | View looking up Fairchild Street towards the Wisconsin Power and Light building, at 122 W. Washington Avenue, under construction, with a man working near a... |
Date: | 02 14 1947 |
---|---|
Description: | Elevated view of the Wisconsin Telephone Co. building site, 122 West Main Street, looking north across basement and first floor. Also shows side views of Y... |
Date: | 10 07 1911 |
---|---|
Description: | Elevated view of the rising waters of the Wisconsin River at the construction site. This view shows the coffer dam, pile drivers, and narrow gauge railroad... |
Date: | |
---|---|
Description: | Elevated view of west side of N. Water Street between E. Buffalo and E. Chicago Streets, featuring the Joys Building, with a contruction area in foreground... |
Date: | 03 1953 |
---|---|
Description: | Elevated view of construction of the new building, at Sixth Street and Highland Avenue. The downtown can be seen in the background, including the Schlitz c... |
Date: | 1905 |
---|---|
Description: | Elevated view of the street and construction site outside of the Plankinton House hotel and various storefronts. Along the street and sidewalks are horse-d... |
Date: | 07 1908 |
---|---|
Description: | Workmen with teams of horses excavate for the new Mercantile Store, later the M.M. Smart Store. A woman is walking on the street nearby, and a boy or man w... |
Date: | 07 1908 |
---|---|
Description: | Workmen with teams of horses excavate for the new Mercantile Store, later the M.M. Smart Store. |
Date: | 10 27 1942 |
---|---|
Description: | Stacks of lumber used in the construction of what is probably International Harvester's Bettendorf Tank Arsenal (factory). The lumber is sitting on the gro... |
Date: | 1925 |
---|---|
Description: | Elevated view north along Clark Street with pedestrians, street cars, trucks and automobiles. Lincoln Park is on the right; the Belden Stratford Hotel is o... |
Date: | 1900 |
---|---|
Description: | Elevated view of a construction site surrounded by buildings in what appears to be an industrial area. A sign on the building on the left side of reads: "W... |
Date: | 11 1995 |
---|---|
Description: | "Moving ground for the Theresa State Bank in Lomira." |
Date: | 1907 |
---|---|
Description: | Three-quarter view of front and side of the almost-completed Winnebago School of Agriculture and Domestic Economy. Construction workers are on the building... |
Date: | 08 19 1925 |
---|---|
Description: | Elevated view looking down at men driving dump trucks and operating a steam shovel and a crane below ground level at a construction site. On the opposite s... |
Date: | 1951 |
---|---|
Description: | Exterior view of the Beth Israel Center synagogue during construction. A worker is standing on the roof of the building, and construction materials are pil... |
Date: | 06 19 1936 |
---|---|
Description: | One man is working on a ladder near the side door of a one and one half story, masonry block building with five garage bays. There are two men on the right... |
Date: | |
---|---|
Description: | A construction site with a view of the excavated foundation and the street level. At the street level are buildings, people, and horse-drawn wagons. One ma... |
Date: | |
---|---|
Description: | A construction site with a view of the excavated foundation and the street level. At the street level are buildings, people, a crane, construction shacks, ... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: