Date: | 03 01 1927 |
---|---|
Description: | Early view of the construction of the Capitol Theatre revealing the steel frame of the building. Two men are working on the right. |
Date: | 05 02 1927 |
---|---|
Description: | Side view from the roof of Kruse's store, towards the Capitol Theatre under construction, of steel frame of structure. |
Date: | 07 23 1931 |
---|---|
Description: | Capital Times model home under construction at 2318 Monroe Street. |
Date: | |
---|---|
Description: | Two men shaking hands while working to complete structural steel work on the Wisconsin State Capitol. |
Date: | 1909 |
---|---|
Description: | Workmen posing on the partially demolished dome of the third Wisconsin State Capitol, together with the hoist used for removing salvaged materials. This d... |
Date: | 1925 |
---|---|
Description: | View looking down at workers at work below street level, with cranes and International trucks excavating area for the future New York City subway. On the r... |
Date: | |
---|---|
Description: | Elevated view of Kilbourn Dam, building apron. Men are working on the dam, and a bridge is in the background. |
Date: | |
---|---|
Description: | Slightly elevated view of men working on the Kilbourn dam. |
Date: | 1929 |
---|---|
Description: | Workers are looking on as a Bucyrus Erie excavating crane is loading dirt into the bed of an International heavy-duty dump truck. |
Date: | 1900 |
---|---|
Description: | Elevated view of construction workers and brick layers nearing completion of construction of the Twine Mill at the McCormick Reaper Works. The factory was ... |
Date: | 08 1907 |
---|---|
Description: | The dismantling of the dome of the third Wisconsin State Capitol began with the removal of the 32-foot flagpole. The eagle at the top of the pole was an 18... |
Date: | 01 10 1939 |
---|---|
Description: | University of Wisconsin Memorial Union Theatre under construction, showing interior with four men on scaffolding. |
Date: | 11 10 1937 |
---|---|
Description: | Castle & Doyle Rex Moto Mixer truck delivering ready mixed concrete in the alley behind Dean Clinic, 113-115 N. Carroll Street, with five men looking on. |
Date: | 12 19 1936 |
---|---|
Description: | View across street towards a three-story house on Bernard Court. The address on the door reads "202," and a sled is leaning up against the wall near the fr... |
Date: | 12 27 1935 |
---|---|
Description: | View across snow-covered ground towards four men constructing the W.I.B.A. radio transmission tower. |
Date: | 06 20 1933 |
---|---|
Description: | Group portrait of eleven workers installing Plibrico Jointless Firebrick in front of a railroad steam locomotive parked beside Fauerbach Brewery. This was ... |
Date: | 08 21 1931 |
---|---|
Description: | View from the west down two sets of railroad tracks towards men working on the Evansville overhead road which is under construction. |
Date: | 07 27 1931 |
---|---|
Description: | Group portrait of workmen in front of the Chicago, Milwaukee and St. Paul railroad viaduct (Olin Avenue - US Highway 12) that is under construction. |
Date: | 01 02 1929 |
---|---|
Description: | Interior view of first floor lobby with construction debris and some tile work completed on the floor. In the background a man is standing on a ladder near... |
Date: | 07 02 1930 |
---|---|
Description: | State Office Building, Wilson Street, construction showing concrete mixer, workers, and a Castle & Doyle truck dumping. |