Date: | 1916 |
---|---|
Description: | Two workers pouring molten metal from a crane-held vat into a mold to make castings at International Harvester's Milwaukee Works. The factory was owned by ... |
Date: | 03 27 1947 |
---|---|
Description: | Wisconsin Telephone Co. building site, 122 West Main Street, looking north across basement and first floor with part of the second floor under construction... |
Date: | 10 04 1946 |
---|---|
Description: | Men work with an International TracTracTor (crawler tractor) in construction of the Merriman Dam. The tractor was owned by S.A. Healy Co., White Plains, Ne... |
Date: | 1910 |
---|---|
Description: | Interior view of an early Pawling and Harnischfeger crane design with cab-operated dial controls. The stencil on the crane says "Pawling and Harnischfeger ... |
Date: | |
---|---|
Description: | Elevated view of shop floor of an early Pawling and Harnischfeger 20-ton type "N" dial controlled cab-operated traveling crane. The crane is in machine sho... |
Date: | 1910 |
---|---|
Description: | An early Pawling and Harnischfeger cab-operated crane with dial operated controllers and a 5-ton type "O" bridge with a type "A" trolley. The operator is i... |
Date: | |
---|---|
Description: | Interior view of Pawling & Harnischfeger hoist cranes in a Schlitz brewery where men are working with beer barrels. |
Date: | 1910 |
---|---|
Description: | Rear view of two Pawling & Harnischfeger 3-ton monorail hoists with lumber handling units laden with lumber and men in the cabs. Both hoists are stamped w... |
Date: | 1910 |
---|---|
Description: | Pawling & Harnischfeger 3-ton monorail hoist in a lumber mill with a man in the cab. Text stamped on cab reads "Capacity 6,000 Lbs., No. 2573." In the lowe... |
Date: | 1910 |
---|---|
Description: | Pawling & Harnischfeger 3-ton monorail hoist with lumber handling unit in the Pacific Lumber Co. lumberyard. There's a man in the cab and the text stamped ... |
Date: | 1911 |
---|---|
Description: | A Pawling & Harnischfeger 3-ton monorail hoist in lumber storage racks. There's a man in the cab, and another man standing at the bottom of one of the stac... |
Date: | 1912 |
---|---|
Description: | Pawling & Harnischfeger 3-ton monorail hoist crane with lumber unit lowering its load at American Lumberman. There is an operator in the cab, and men on th... |
Date: | 1912 |
---|---|
Description: | Six Pawling & Harnischfeger 3-ton monorail hoists at a lumber mill (probably Pacific Lumber Co.). There are men on the ground as well as operating the cran... |
Date: | 1913 |
---|---|
Description: | Pawling & Harnischfeger 5-ton monorail hoist with a lumber handling unit preparing to load lumber onto a boat in what is possibly Pensacola, Florida. Two m... |
Date: | |
---|---|
Description: | Milwaukee Electric Crane & Manufacturing Company monorail hoist with lumber handling unit on a monorail track with an operator in the cab at Long Bell Lumb... |
Date: | |
---|---|
Description: | Milwaukee Electric Crane & Manufacturing Company transfer bridge with a magnetic hoist at the Enterprise Foundry Company. There's a sign on the cab that re... |
Date: | |
---|---|
Description: | Milwaukee Electric Crane & Manufacturing Company gantry crane involved with the construction of a bridge. There is a sign on the crane that reads "The Milw... |
Date: | 09 30 1943 |
---|---|
Description: | The 56th Construction Battalion of Seabees dismantles fuel tanks using a crane and an International K-line truck. The original caption reads: "Project No. ... |
Date: | 07 21 1942 |
---|---|
Description: | Men pouring and smoothing cement on the construction site of the Ordnance Steel Foundry Company. The Foundry may have served as part of International Harve... |
Date: | |
---|---|
Description: | A crane lowers a beam onto the frame of a boat. Workers can be seen standing along the top of the vessel and scaling a ladder. Construction equipment and m... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: