Date: | 08 29 1930 |
---|---|
Description: | Two cranes and a car at the bridge construction site. Several workers work on carving out the road at the edge of the river. |
Date: | 1976 |
---|---|
Description: | Color photo of workers cutting blocks of limestone in a quarry. There are what appear to be moveable platforms on tracks at the bottom of the face of the a... |
Date: | 1972 |
---|---|
Description: | Slightly elevated view of a man operating a 560 Hough Pay Loader. C&M Enterprises, excavation contractors, are using two Hough Pay Loaders: a new 560 and a... |
Date: | 1972 |
---|---|
Description: | Slightly elevated view of a man operating a 560 Hough Pay Loader. C&M Enterprises, excavation contractors, are using two Hough Pay Loaders: a new 560 and a... |
Date: | 1972 |
---|---|
Description: | Slightly elevated view of a 560 Hough Pay Loader adding material to a dump truck. C&M Enterprises, excavation contractors, are using two Hough Pay Loaders:... |
Date: | 1935 |
---|---|
Description: | Panoramic view of the construction of the Norris Dam, looking upstream. On the left the text reads: "West Bank," and on the right it reads: "East Bank." |
Date: | 08 01 1936 |
---|---|
Description: | Elevated, panoramic view of the Pickwick Dam under construction. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: