Date: | 08 1907 |
---|---|
Description: | The dismantling of the dome of the third Wisconsin State Capitol began with the removal of the 32-foot flagpole. The eagle at the top of the pole was an 18... |
Date: | 10 1869 |
---|---|
Description: | The second Wisconsin State Capitol dome under construction, showing the workmen and the equipment they used to hoist construction materials into place. |
Date: | 1935 |
---|---|
Description: | Tapered columns in the Johnson Wax Building during construction. Workmen are working on scaffolding built around one of the columns. The building was desig... |
Date: | |
---|---|
Description: | Workers erecting scaffolding outside the First Unitarian Society Meeting House during construction. The building was designed by Frank Lloyd Wright and the... |
Date: | 1899 |
---|---|
Description: | Interior of State Historical Society of Wisconsin during construction. Image shows bricks used in the building and workers. |
Date: | 1969 |
---|---|
Description: | View of the cement and steel framework in the foundation of one of the buildings in the World Trade Center. Two men are working on a platform on the wall o... |
Date: | 1969 |
---|---|
Description: | A construction worker wearing a yellow hard hat stands in the foreground. In the background is the steel framework of one of the The World Trade Center tow... |
Date: | 1920 |
---|---|
Description: | Men pose in front of the University Club, 803 State Street, which is under construction. William F. Steuber, Sr. is the third man from the left. |
Date: | 06 15 1949 |
---|---|
Description: | The Shell filling station, 341 State Street as workers are starting to tear it down. The station, built in 1924 and at one time adjudged the second most be... |
Date: | 06 15 1948 |
---|---|
Description: | The Shell filling station, 341 State Street, as workers are starting to tear it down. The station, built in 1924 and at one time judged the second most bea... |
Date: | 1901 |
---|---|
Description: | Construction crew raising a brick building. The structure is entirely surrounded by scaffolding. A large stone piece is being hoisted into place while a wo... |
Date: | 1933 |
---|---|
Description: | Exterior view of foundation and elaborate frame of a Gothic roofed barn, partially built. |
Date: | 1903 |
---|---|
Description: | View of a group of construction workers standing on the side of the building on a stack of lumber. They are using a large wooden structure supporting a pul... |
Date: | 1903 |
---|---|
Description: | Two workers on one of the upper floors of the Eau Claire Public Library during its construction. The frames of the arched windows are in the background. Th... |
Date: | 1903 |
---|---|
Description: | Portions of columns awaiting installation are stacked near a wooden open-sided building during the construction of the Eau Claire Public Library at Farwell... |
Date: | 1903 |
---|---|
Description: | View of a worker under a roofed, open-sided wood structure chiseling details in the capitals of what will be the top of the columns of the Eau Claire Publi... |
Date: | 08 19 1954 |
---|---|
Description: | View of a worker laying concrete blocks to close off one of the three front entrances to the State Historical Society of Wisconsin headquarters building. A... |
Date: | 1910 |
---|---|
Description: | Six men in work clothes posing near a porch of a house under construction. Hollow core concrete blocks, most likely manufactured on site with local sand an... |
Date: | 1905 |
---|---|
Description: | Three men, identified on the negative envelope as "Mr. Miller, Boots, and Lavine," are posing on the roof of a large two-story cement block house under con... |
Date: | 03 26 1938 |
---|---|
Description: | Three men are working on the top of the mill building. There is no roof, and the logs are not filled in or chinked. The road curves from the left in the ba... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: