Date: | 1901 |
---|---|
Description: | A crew of construction workers paving North Main Street with brick. |
Date: | 1901 |
---|---|
Description: | View down East Mifflin Street looking north near Blair Street. Men are working on road construction. |
Date: | 1914 |
---|---|
Description: | Paving the main street with concrete was an occasion that brought out a large part of the Clintonville community to watch. |
Date: | 08 1912 |
---|---|
Description: | Two African American men unloading the cement chute during paving of Janesville Plank Road. |
Date: | 1922 |
---|---|
Description: | This photograph from the Wisconsin Highway Commission records is unidentified, but a few internal details helps to understand the content. The Wisconsin li... |
Date: | 1952 |
---|---|
Description: | Milwaukee streets department employees repair the intersection of Meinecke Avenue and 12th Street. Behind them, a Blatz truck is making a delivery to the ... |
Date: | 1890 |
---|---|
Description: | Section of the factory at a crossroads with road construction workers outside. Name of company visible on building. |
Date: | 06 02 1943 |
---|---|
Description: | Looking south down street, with storefronts on either side. The street and bridge are undergoing reconstruction. Military vehicles are in the background. |
Date: | 06 02 1943 |
---|---|
Description: | Looking south. A jeep sits in the middle of the construction zone. The storefronts are covered with quilts and blankets. |
Date: | 04 15 1916 |
---|---|
Description: | Pawling & Harnischfeger concrete breaker on a residential street with a operator in the cab. Men are working in the street, and trees and power lines are l... |
Date: | 04 18 1916 |
---|---|
Description: | Pawling & Harnischfeger gasoline powered concrete breaker on a residential street with an operator in the cab and men working on the ground. Houses and yar... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: