Date: | |
---|---|
Description: | Elevated view of York Iron works. Large group of men posing in yard. The boardinghouse is on a hill in the far background. Early iron was mined at Mayville... |
Date: | |
---|---|
Description: | View from shoreline towards the Soo Line railroad bridge crossing the Tomahawk River at Bradley, Wisconsin. The bridge, built in 1886, was 126 ft. long and... |
Date: | |
---|---|
Description: | View across field towards the railroad bridge, seen with the construction almost completed. A man is standing in the middle of the bridge, and two or three... |
Date: | |
---|---|
Description: | Railroad bridge construction at an unknown location somewhere on the Chicago, Milwaukee, and St. Paul Railroad line. There is a church in the background on... |
Date: | |
---|---|
Description: | Billboards with advertising for the "Georgia Up-To-Date Minstrels" at the Opera House on Saturday, April 7. Bridge visible to the left. The J.J. McGillivra... |
Date: | 06 19 1911 |
---|---|
Description: | Looking west over the Wisconsin River at the unfinished narrow gauge railroad trestle built for construction of the dam. Two pile drivers are seen in the a... |
Date: | 06 21 1911 |
---|---|
Description: | Looking east over the Wisconsin River showing the unfinished narrow gauge railroad trestle. Two steam-driven pile drivers on barges with construction worke... |
Date: | 10 07 1911 |
---|---|
Description: | Workers attempt to secure the trestle against high water on the Wisconsin River during construction of the power dam. |
Date: | 09 03 1912 |
---|---|
Description: | An experimental reaper(?) in a factory yard. There is a Russian name on the Reaper, and the front is set up on saw-horses. Men are working near a brick fac... |
Date: | 02 08 1913 |
---|---|
Description: | A winter view with workers posing with brush mats at the power dam construction site. The gate guides and high trestle form the background. |
Date: | 02 01 1914 |
---|---|
Description: | A view looking west toward the lock and power house at the Prairie du Sac dam. Pilings and the elevated trestle are in the foreground. Men can be seen work... |
Date: | 03 11 1914 |
---|---|
Description: | Elevated view looking east from the lock at the Prairie du Sac dam. Recently completed buttresses are in the foreground, with earlier stages of constructio... |
Date: | 05 17 1912 |
---|---|
Description: | Elevated view of workers using shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in... |
Date: | 09 30 1912 |
---|---|
Description: | Forms have been removed from the first concrete poured for the power house in the northeast corner of the coffer dam. Men are pouring concrete from rail ca... |
Date: | 1889 |
---|---|
Description: | Chicago & North Western Railway viaduct on the line along the Milwaukee River. The viaduct has two arched passages, and stones and rocks lining the path f... |
Date: | 1938 |
---|---|
Description: | View from railroad bridge of the harbor at Green Bay. On the other side of the harbor, there are many industrial buildings, including Northern Paper Mills,... |
Date: | |
---|---|
Description: | A railroad bridge crosses over Red Cedar River. |
Date: | 1910 |
---|---|
Description: | Exterior view of the Illinois Central Railroad Station, from a bridge crossing over the tracks, built in 1918. |
Date: | |
---|---|
Description: | Elevated view of York Iron Works with a view of the blast furnace and pig iron stock piles. The boardinghouse is visible on the hill in the far background. |
Date: | 1912 |
---|---|
Description: | Elevated view of a construction site of a bridge across the cutoff on the river. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: