Date: | 08 07 1912 |
---|---|
Description: | Men excavating within the coffer dam. One man is standing on a high piling. Several steam engines at work fill the air with smoke. The high trestle and fou... |
Date: | 08 18 1912 |
---|---|
Description: | Eight cooks posing inside the dining hall. Long tables are set for a meal. |
Date: | 09 30 1912 |
---|---|
Description: | Pile drivers working within the confines of the coffer dam. Men are on the high trestle constructing chutes for pouring concrete. |
Date: | 10 23 1923 |
---|---|
Description: | Men working on the concrete chutes and elevated trestle. Iron reinforcing bars protrude from the forms. |
Date: | 11 02 1912 |
---|---|
Description: | Workmen using a crane to erect the gate guides for the power house. |
Date: | 11 02 1912 |
---|---|
Description: | Workmen posing during erection of the draft tubes for the power house at the Prairie du Sac dam. |
Date: | 11 21 1912 |
---|---|
Description: | Elevated view within the coffer dam showing four steel draft tubes; wooden supports are visible inside one of the tubes. |
Date: | 11 21 1912 |
---|---|
Description: | Workmen posing on and in front of the steel draft tubes. The gate guides are visible on the right. |
Date: | 11 21 1912 |
---|---|
Description: | Two workmen standing in the outlet of a steel draft tube in the power house, while other men are working above it. Cars are moving along the elevated trest... |
Date: | 02 08 1913 |
---|---|
Description: | A winter view with workers posing with brush mats at the power dam construction site. The gate guides and high trestle form the background. |
Date: | 03 11 1913 |
---|---|
Description: | Workers posing by a piling coated with sand suspended from a crane. |
Date: | 04 07 1913 |
---|---|
Description: | Five men, two well-dressed, posing on electric rail cars during construction of the dam. |
Date: | 05 17 1913 |
---|---|
Description: | Progress on the power house construction, with the east portion of the wall complete, and men working on forms for the rest of the wall. |
Date: | 05 28 1913 |
---|---|
Description: | Workmen on temporary walkways among reinforcing bars on the roof of the power house. |
Date: | 05 28 1913 |
---|---|
Description: | Power dam construction workers pausing during a meal in the camp dining room. Oil lamps are hanging from the ceiling; overhead electric lights are also ins... |
Date: | 05 28 1913 |
---|---|
Description: | Cooks posing in the kitchen at the power dam workers' camp. |
Date: | 06 13 1913 |
---|---|
Description: | Workmen and machinery at the quarry on Blackhawk Bluff. The gravel was used in construction of the power dam. |
Date: | 07 29 1913 |
---|---|
Description: | A view of the power house from the southwest, showing bricklayers and other workers. The narrow gauge railroad is in the foreground. |
Date: | 10 10 1913 |
---|---|
Description: | Workers posing with roof trusses on the power house, 85 feet above the water level at the Prairie du Sac Dam. Note the brickwork in progress. |
Date: | 02 01 1914 |
---|---|
Description: | A view looking west toward the lock and power house at the Prairie du Sac dam. Pilings and the elevated trestle are in the foreground. Men can be seen work... |