Skip to main content

click zoom to display a high-res image
Photographs

Northeast View of Interior of Power House Coffer Dam

Image

Pile drivers working within the confines of the coffer dam. Men are on the high trestle constructing chutes for pouring concrete.

Date Created:
September 30, 1912
Creator:
Eberhart, F. S.

Publication Information

Creator
Eberhart, F. S.
Date Created
September 30, 1912

Physical Description

Format
Image
Extent
1 photograph
Dimensions
17 x 11 cm

Collection Information

Copyright Information

Copyright Status
NO COPYRIGHT - UNITED STATES
Rights Holder
Wisconsin Historical Society
Unique ID
W012GFV
Legacy ID
WHi 47844

Image

Digital Collections

Explore more than 100,000 collection items online through the Society’s digital collections. For over two decades, we’ve been scanning, photographing, and digitizing materials from our collections, creating a rich and growing digital archive that brings history closer to you.
 
The Wisconsin Historical Society offers an ever-growing digital collection. Digitized materials reflect the full range of items in the collections including photographs, letters, newsletters, films, posters, architectural drawings, menus, and ephemera.

View Our Curated Collections

Attribution

For a credit line: Wisconsin Historical Society, Creator, Title, Unique Identifier. 

The Unique Identifier can be found at the top or bottom of the page for each item. The name of a downloaded file is NOT the unique identifier.

For bibliographic citations please consult the UW-Madison Libraries Citation Research Guide to ensure compliance with appropriate style guidelines.

 

 

Accessing Collections

The vast majority of the items in our collections are not online. The Society owns thousands of archival collections viewable in our Archives reading room. To view and conduct research in our collections, visit us in person.

Plan Your Visit

Photographs
High Bridge and West Shore Coffer Dam

High Bridge and West Shore Coffer Dam

August 1, 1912

Elevated view of the power dam construction site from the west, showing the elevated trestle, coffer dam, and steam pile drivers. The concrete plant is visible on the east bank. Note that high wate...

View
Photographs
Excavating in West End of Power House Coffer Dam

Excavating in West End of Power House Coffer Dam

July 25, 1912

A boy posing in the excavation site for the power house within the coffer dam. He is standing on the narrow gauge tracks; the high trestle is in the background.

View
Photographs
General View, Looking East of Work on Power Dam

General View, Looking East of Work on Power Dam

June 16, 1912

Elevated view of steam powered pile drivers at work on the coffer dam.

View
Photographs
North View Interior Power House Coffer Dam

North View Interior Power House Coffer Dam

September 30, 1912

Forms have been removed from the first concrete poured for the power house in the northeast corner of the coffer dam. Men are pouring concrete from rail cars on the high trestles into the forms for...

View
Photographs
Steel Draft Tubes in Power House Coffer Dam

Steel Draft Tubes in Power House Coffer Dam

November 21, 1912

Elevated view within the coffer dam showing four steel draft tubes; wooden supports are visible inside one of the tubes.

View
Photographs
General View of Power House Coffer Dam and High Trestle

General View of Power House Coffer Dam and High Trestle

July 16, 1912

An overview, from the west bank, of the power dam construction site. The high trestle is in the background, and the narrow gauge electric railroad is in the foreground.

View
Go to top
Wisconsin Historical Society
Search Dropdown