Date: | 11 20 1963 |
---|---|
Description: | A three-year-old poses with a man-sized shovel of soil during a groundbreaking ceremony at the site of a new preschool. Behind him is a large steam shovel. |
Date: | 09 07 1930 |
---|---|
Description: | University of Wisconsin-Madison Mechanical Engineering Building at 1513 University Avenue under construction. Men are working on the steel framework. A mas... |
Date: | 02 24 1950 |
---|---|
Description: | A group of workmen posing in front of the First Unitarian Society Meeting House during construction. This is one of two "work days" the men donated to the ... |
Date: | 05 09 1912 |
---|---|
Description: | Men with shovels working downstream from the east abutment, while other men are looking on. |
Date: | 1915 |
---|---|
Description: | Elevated view of a group of workers posing on the east bank of the Wisconsin River at the power dam construction site. One man is strumming his shovel like... |
Date: | 1914 |
---|---|
Description: | A group of workmen posing while working on concrete forms at the Prairie du Sac dam site. Their position high above the water level affords an expansive up... |
Date: | 04 14 1911 |
---|---|
Description: | Workers posing inside the forms for the east shore abutment at the power dam site. |
Date: | 05 17 1912 |
---|---|
Description: | Elevated view of workers using shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in... |
Date: | 05 09 1948 |
---|---|
Description: | Bishop William P. O'Connor of the Madison Diocese is shown removing the first shovel of dirt at the ground-breaking of the Queen of Apostles Seminary being... |
Date: | 07 18 1948 |
---|---|
Description: | Bishop William P. O'Connor, in vestments, turning the first shovel of dirt for the building that will contain the parish auditorium and six classrooms on t... |
Date: | 08 23 1948 |
---|---|
Description: | City manager Leonard G. Howell, breaking the ground with a shovel, at the ground-breaking ceremony for the new Naval Reserve training center in Kendall Fie... |
Date: | 1942 |
---|---|
Description: | Two men talking on a construction site, probably at International Harvester's Bettendorf Tank Arsenal (factory). A pile of bricks is in the foreground alon... |
Date: | 1942 |
---|---|
Description: | Construction site showing an additional to an International Harvester factory, probably the company's Bettendorf Tank Arsenal. |
Date: | 07 1908 |
---|---|
Description: | Workmen with teams of horses excavate for the new Mercantile Store, later the M.M. Smart Store. |
Date: | |
---|---|
Description: | An interior view of partially-built dressing court, showing men working at roughing in plumbing to floor drains of the bathhouse at Devil's Lake State Park... |
Date: | 1912 |
---|---|
Description: | Men working on the construction site for Stationary Engine Test Building #24 at International Harvester's Milwaukee Works factory. |
Date: | 05 08 1950 |
---|---|
Description: | The cornerstone for the million-dollar four-story addition to the Madison Vocational School was laid at the corner of North Carroll and West Dayton Streets... |
Date: | 08 22 1964 |
---|---|
Description: | Two men construct an addition to Mr. Jack Myers' house on Washington Island. |
Date: | 07 10 1942 |
---|---|
Description: | Overhead view of four people standing in a muddy excavated hole for a footing at the Ordnance Steel Foundry. The Foundry may have served as part of Interna... |
Date: | 07 21 1942 |
---|---|
Description: | Men pouring and smoothing cement on the construction site of the Ordnance Steel Foundry Company. The Foundry may have served as part of International Harve... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: