Date: | 09 30 1912 |
---|---|
Description: | Pile drivers working within the confines of the coffer dam. Men are on the high trestle constructing chutes for pouring concrete. |
Date: | 1919 |
---|---|
Description: | Exterior view from street of the Chattanooga Plow Works. Lettering on the building reads "Chattanooga Plow Company." The photograph was likely taken around... |
Date: | 10 17 1912 |
---|---|
Description: | Concrete plant at east end of the dam, showing the mixers, crane, and a rail car at the abutment. |
Date: | 10 23 1923 |
---|---|
Description: | Men working on the concrete chutes and elevated trestle. Iron reinforcing bars protrude from the forms. |
Date: | 11 21 1912 |
---|---|
Description: | Two workmen standing in the outlet of a steel draft tube in the power house, while other men are working above it. Cars are moving along the elevated trest... |
Date: | 12 29 1912 |
---|---|
Description: | Elevated view of the progress within the coffer dam showing concrete forms around the draft tubes and gate guides. The high trestle is seen extending to th... |
Date: | 02 08 1913 |
---|---|
Description: | A winter view with workers posing with brush mats at the power dam construction site. The gate guides and high trestle form the background. |
Date: | 03 19 1913 |
---|---|
Description: | A view, looking east, of the wreckage of the high trestle caused by flooding and ice. The concrete plant is visible on the far bank. |
Date: | 04 07 1913 |
---|---|
Description: | Five men, two well-dressed, posing on electric rail cars during construction of the dam. |
Date: | 1919 |
---|---|
Description: | Exterior view of the Patten Manufacturing Company. |
Date: | 06 29 1913 |
---|---|
Description: | View from the west bank of the Wisconsin River showing progress on the power dam. The narrow gauge track is visible in the foreground. |
Date: | 07 18 1913 |
---|---|
Description: | Workers and a boy, Edgar Walch, posing on and around a steam shovel in the quarry at Eagle View Bluff. Edgar's father, Engelbert Walch, owned the steam sho... |
Date: | 07 29 1913 |
---|---|
Description: | A view of the power house from the southwest, showing bricklayers and other workers. The narrow gauge railroad is in the foreground. |
Date: | 09 01 1913 |
---|---|
Description: | Elevated view of the power house from the southwest showing progress of the brickwork. Two railroad cars are standing on the railroad extension. Workers ar... |
Date: | 11 01 1913 |
---|---|
Description: | Elevated view from the hill, looking northeast at the power house at the Prairie du Sac dam. Much of the brickwork has been completed. Concrete forms for t... |
Date: | 02 01 1914 |
---|---|
Description: | A view looking west toward the lock and power house at the Prairie du Sac dam. Pilings and the elevated trestle are in the foreground. Men can be seen work... |
Date: | 03 11 1914 |
---|---|
Description: | Elevated view looking east from the lock at the Prairie du Sac dam. Recently completed buttresses are in the foreground, with earlier stages of constructio... |
Date: | 05 13 1914 |
---|---|
Description: | A view upstream through the lock at the Prairie du Sac dam. Workmen are guiding a barge through the lock as a man and woman are watching from steps in the ... |
Date: | 10 11 1914 |
---|---|
Description: | Elevated view looking east across the power house, lock, and uncompleted portion of the dam. The concrete plant is seen on the far bank. The rising water o... |
Date: | 02 28 1915 |
---|---|
Description: | Elevated view, looking east, of the power house, lock, and dam on the Wisconsin River. |