Date: | |
---|---|
Description: | Lumber workers laying railroad tracks through the woods. |
Date: | 1907 |
---|---|
Description: | Wisconsin Central locomotive No #50 and pile driver No #2 working near Owen. Men stand on and around the tracks. |
Date: | 1907 |
---|---|
Description: | View from shoreline of men standing on the bridge over west branch of the Wolf River. They are constructing the Wisconsin & Northern railroad bridge. |
Date: | 1890 |
---|---|
Description: | Men building a culvert on the Milwaukee, Lake Shore & Westerm railway. In the background both horses and oxen teams are being used. |
Date: | |
---|---|
Description: | View down railroad tracks towards a group of construction workers posed near the east portal of the railroad tunnel near Tunnel City. |
Date: | 1911 |
---|---|
Description: | Workers erecting a steam driven pile driver while others survey for the railroad extension from the village of Prairie du Sac to the dam site on the Wiscon... |
Date: | 04 1911 |
---|---|
Description: | Workmen pose on a steam-powered pile driver at work at the north end of the slough on the Wisconsin River. The railroad was extended from the village to th... |
Date: | 10 07 1911 |
---|---|
Description: | Elevated view of the rising waters of the Wisconsin River at the construction site. This view shows the coffer dam, pile drivers, and narrow gauge railroad... |
Date: | 10 11 1911 |
---|---|
Description: | Elevated view of high water on the Wisconsin River which has inundated the coffer dam at the construction site. The narrow gauge railroad (curved line in f... |
Date: | 1922 |
---|---|
Description: | View across field of workers constructing a Chicago, Burlington and Quincy Railroad bridge. |
Date: | 10 05 1972 |
---|---|
Description: | International Harvester Scout in construction site. Original caption reads: "Photo # W-6965-- Scout vehicle from International Trucks offers many construct... |
Date: | 1948 |
---|---|
Description: | View down sidewalk along Washington Street facing east. Excavation is going on between S. 8th and S. 9th Streets. A crew is mixing concrete and doing work ... |
Date: | 1948 |
---|---|
Description: | Crews of the Vinton Construction Co. are laying a 20 foot wide concrete slab in front of the northeast corner of Washington and S. 9th Streets. A truck is ... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: