Date: | 1909 |
---|---|
Description: | Workmen posing on the partially demolished dome of the third Wisconsin State Capitol, together with the hoist used for removing salvaged materials. This d... |
Date: | 07 1914 |
---|---|
Description: | Starting to raise "Wisconsin" statue onto the dome of the Wisconsin State Capitol (the fourth State Capitol, the third in Madison, 1906 - ). The gilded bro... |
Date: | 08 1907 |
---|---|
Description: | The dismantling of the dome of the third Wisconsin State Capitol began with the removal of the 32-foot flagpole. The eagle at the top of the pole was an 18... |
Date: | 1910 |
---|---|
Description: | Group portrait of the crew that constructed the Wisconsin State Capitol dome. The new East Wing is visible in the background. |
Date: | 1905 |
---|---|
Description: | Construction crew building a double streetcar track around the Capitol Square on North Pinckney Street. The oversized awnings were common around the Square... |
Date: | 1909 |
---|---|
Description: | Close-up of the demolition of the dome of the Third Capitol, one of the few known photographs that permits such close observation of the architectural deta... |
Date: | 1907 |
---|---|
Description: | Wisconsin Central locomotive No #50 and pile driver No #2 working near Owen. Men stand on and around the tracks. |
Date: | 1925 |
---|---|
Description: | Construction workers stand in front of the Butterfield covered bridge. |
Date: | 1922 |
---|---|
Description: | Construction site with construction crew working, people walking on the sidewalk, and a billboard advertising Oshkosh B'gosh. |
Date: | 1923 |
---|---|
Description: | Elevated view of a bridge over the Black River during construction. It was built during 1923 and 1924 by the Wausau Iron Works. Tom Cleary was the Resident... |
Date: | 1921 |
---|---|
Description: | A construction site with a truck manufactured by Winther Motor and Truck Company. A forty foot boom is mounted on the truck. Workers are positioning a stee... |
Date: | 1939 |
---|---|
Description: | A WPA program on the State Fair Grounds. The workers have dug a long trench, and the project probably concerns improved sanitary facilities for the fair, a... |
Date: | 1940 |
---|---|
Description: | A restored Cornish miner's house, called Polperro, built in the 1840s, on Shake Rag Street undergoing restoration. The house was temporarily covered with s... |
Date: | 1910 |
---|---|
Description: | St. Josaphat's Church in Milwaukee under construction. |
Date: | 1910 |
---|---|
Description: | Construction workers are posed in front of the partially-built St. Josaphat's Church on scaffolding and wooden steps near large columns. There are two chil... |
Date: | 08 1911 |
---|---|
Description: | Exterior view of First National Bank under construction. |
Date: | 05 05 1911 |
---|---|
Description: | Elevated view of construction on Arpin's dam. Men are working on the right. Caption reads: "Arpin's Dam at Radisson, Wis". |
Date: | 1935 |
---|---|
Description: | Construction on Mount Rushmore. Scaffolding is visible across Abraham Lincoln's face. Work has just begun on Theodore Roosevelt. |
Date: | 1955 |
---|---|
Description: | Construction work in the Historical Society Library Reading Room in preparation for installing linoleum floor tiles. |
Date: | 1959 |
---|---|
Description: | Scaffolding in the Historical Society Library Reading Room used to replace the art glass in the skylights and the original brass ceiling lights. Flouresce... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: