Date: | 10 12 1911 |
---|---|
Description: | High water on the Wisconsin River has submerged the coffer dam and trestle. Two pile drivers remain in place. Log pilings are floating near the western sh... |
Date: | 03 03 1912 |
---|---|
Description: | Two women and a man posing among the timber pilings near the east shore of the river. Wooden concrete forms and two buildings are in the background. |
Date: | 04 13 1912 |
---|---|
Description: | The concrete mixer standing near the newly poured east shore abutment while men are working nearby. Reinforcing rods protrude from the abutment. |
Date: | 04 13 1912 |
---|---|
Description: | Workmen operating a steam shovel loading gravel into electric rail cars during construction of the power dam. |
Date: | 05 03 1912 |
---|---|
Description: | Workmen on a barge using a pulley to raise sheet steel pilings which were damaged by high water in October, 1911. |
Date: | 05 10 1912 |
---|---|
Description: | Work progresses on the wooden concrete forms at the east side of the river. The steam-powered pile drivers are also visible. |
Date: | 06 16 1912 |
---|---|
Description: | Elevated view of steam powered pile drivers at work on the coffer dam. |
Date: | 09 30 1912 |
---|---|
Description: | Pile drivers working within the confines of the coffer dam. Men are on the high trestle constructing chutes for pouring concrete. |
Date: | 10 17 1912 |
---|---|
Description: | Concrete plant at east end of the dam, showing the mixers, crane, and a rail car at the abutment. |
Date: | 11 02 1912 |
---|---|
Description: | Workmen using a crane to erect the gate guides for the power house. |
Date: | 11 21 1912 |
---|---|
Description: | Elevated view of the progress of construction within the coffer dam showing the gate guides and draft tubes in place. Concrete forms and chutes, as well as... |
Date: | 03 11 1913 |
---|---|
Description: | Workers posing by a piling coated with sand suspended from a crane. |
Date: | 05 28 1913 |
---|---|
Description: | Workmen on temporary walkways among reinforcing bars on the roof of the power house. |
Date: | 03 11 1914 |
---|---|
Description: | Elevated view looking east from the lock at the Prairie du Sac dam. Recently completed buttresses are in the foreground, with earlier stages of constructio... |
Date: | 1915 |
---|---|
Description: | Elevated view of a group of workers posing on the east bank of the Wisconsin River at the power dam construction site. One man is strumming his shovel like... |
Date: | 05 17 1912 |
---|---|
Description: | Elevated view of workers using shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in... |
Date: | 05 31 1912 |
---|---|
Description: | Workers maneuvering a load of gravel into a concrete mixer at the plant on the east bank of the river. The east abutment is in the foreground, left. |
Date: | 11 01 1913 |
---|---|
Description: | Wooden forms are in place for construction of the walls of the lock at the Prairie du Sac dam. The newly constructed power house is on the left. |
Date: | 1924 |
---|---|
Description: | Children play on makeshift seesaws created from construction materials outside the old schoolhouse. |
Date: | 1913 |
---|---|
Description: | Elevated view of a power dam on the Wisconsin River under construction. There is a rowboat in the foreground. On the opposite shoreline are trees and bluff... |
If you didn't find the material you searched for, our Library Reference Staff can help.