Date: | 07 02 1930 |
---|---|
Description: | State Office Building, Wilson Street, construction showing concrete mixer, workers, and a Castle & Doyle truck dumping. |
Date: | 08 01 1930 |
---|---|
Description: | Basement and ground floor of State Office Building, 1 W. Wilson Street, under construction. View toward Lake Monona. |
Date: | 09 30 1912 |
---|---|
Description: | Pile drivers working within the confines of the coffer dam. Men are on the high trestle constructing chutes for pouring concrete. |
Date: | 05 17 1912 |
---|---|
Description: | Elevated view of workers using shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in... |
Date: | 1913 |
---|---|
Description: | View looking down on construction site of a dam. Two pulley-operated hoists are erect. Men pose from the top of the dam. |
Date: | 03 21 1997 |
---|---|
Description: | "The base of the new water tower is now taking shape." |
Date: | |
---|---|
Description: | Elevated view of workers putting in concrete to create an apron for the power dam they're building. Two men in suits are standing on a platform on the far ... |
Date: | |
---|---|
Description: | Two men are standing and watching as a construction crew is pouring cement at the Hill Farms State Office Building. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: