Date: | 09 23 1965 |
---|---|
Description: | The new "30 on the Square" building at the corner of West Mifflin and North Carroll Street, shown almost completed. |
Date: | 1899 |
---|---|
Description: | Elevated view of a horse-drawn wagon loaded with lumber standing in front of the frame of building under construction facing Main Street. There is a worker... |
Date: | 1903 |
---|---|
Description: | Three columns are resting on the ground on wooden supports before being installed in the facade of the Eau Claire Public Library during construction. The l... |
Date: | 1903 |
---|---|
Description: | View across unpaved road toward construction workers loading a stone slab onto a horse-drawn wagon during the construction of the Eau Claire Public Library... |
Date: | 06 16 1903 |
---|---|
Description: | View from back of stage toward men sitting in chairs listening to a man standing and speaking at the ceremony at which the cornerstone for the Eau Claire P... |
Date: | 1903 |
---|---|
Description: | View from the rear of the Eau Claire Public Library during its construction. A construction worker stands at the base of a wooden support structure with a ... |
Date: | 1903 |
---|---|
Description: | View of group of construction workers lifting stonework into place with a large wooden structure supporting a winch and pulley system during the during the... |
Date: | 1903 |
---|---|
Description: | Construction workers are laying stone on the facade of the Eau Claire Public Library at Farwell Street and Grand Avenue. One man is standing on the first f... |
Date: | 1903 |
---|---|
Description: | A newly installed I-beam on top of brickwork shows the progress of the construction of the Eau Claire Public Library at Farwell Street and Grand Avenue. In... |
Date: | 1903 |
---|---|
Description: | View from street toward the partially completed construction of the Eau Claire Public Library at Farwell Street and Grand Avenue. A man is standing and wat... |
Date: | 06 16 1903 |
---|---|
Description: | View along the side of library building during its construction. The cornerstone of the Eau Claire Public Library is resting on a wooden platform before it... |
Date: | 1903 |
---|---|
Description: | Two men are standing and posing beside the cornerstone of the Eau Claire Public Library. A third man is standing on the far left just above and behind the ... |
Date: | 1903 |
---|---|
Description: | View looking down toward construction workers moving a stone slab for the facade into place during the construction of the Eau Claire Public Library at Far... |
Date: | 1769 |
---|---|
Description: | Map of New Orleans at the start of the French & Indian War, including two inset maps of the Mississippi River Delta and Fort la Balise. It shows streets, r... |
Date: | 1761 |
---|---|
Description: | Map of New Orleans with north oriented towards the upper right corner. It shows the land around the city, the Mississippi River, anchorages, roads leading ... |
Date: | 08 19 1925 |
---|---|
Description: | View along street towards pedestrians on the left. On the right, below street level, are construction workers standing below street level near trucks and a... |
Date: | 1913 |
---|---|
Description: | View across street towards temporary derricks protruding from the steel framework of the dome on the Wisconsin State Capitol. The lantern cage tops the dom... |
Date: | 1914 |
---|---|
Description: | View across street towards a group of children standing in front of the Glander Building under construction on the northeast corner of S. 9th and Washingto... |
Date: | 1930 |
---|---|
Description: | Construction site of the Wisconsin Power and Light Co. Office Building & Bus Station. The address of the bus station was 122 West Washington Avenue, but th... |
Date: | 1962 |
---|---|
Description: | Aerial view of the Hill Farms State Office Building, 4802 Sheboygan Avenue, during construction. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: