Photograph

Hoisting Machine Loading Pilings on Barge at Prairie du Sac Dam Site

Date: 03 1911
Description: Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are in the distance.
Photograph

Foundation Piles and Concrete Forms at East End of Power Dam

Date: 03 03 1912
Description: Two women and a man posing among the timber pilings near the east shore of the river. Wooden concrete forms and two buildings are in the background.
Photograph

Pulling Steel Sheet Piling at Power Dam

Date: 05 03 1912
Description: Workmen on a barge using a pulley to raise sheet steel pilings which were damaged by high water in October, 1911.
Photograph

General View, Looking East of Work on Power Dam

Date: 06 16 1912
Description: Elevated view of steam powered pile drivers at work on the coffer dam.
Photograph

Northeast View of Interior of Power House Coffer Dam

Date: 09 30 1912
Description: Pile drivers working within the confines of the coffer dam. Men are on the high trestle constructing chutes for pouring concrete.
Photograph

Concrete Mixers and Hoisting Crane, East End of Power Dam

Date: 10 17 1912
Description: Concrete plant at east end of the dam, showing the mixers, crane, and a rail car at the abutment.
Photograph

Erecting Gate Guides in Power House at Power Dam

Date: 11 02 1912
Description: Workmen using a crane to erect the gate guides for the power house.
Photograph

Pile Coated with Sand at Power Dam

Date: 03 11 1913
Description: Workers posing by a piling coated with sand suspended from a crane.
Photograph

Pen Stock Roof in Power House at Power Dam

Date: 05 28 1913
Description: Workmen on temporary walkways among reinforcing bars on the roof of the power house.
Photograph

Downsteam Side of Power House at Power Dam

Date: 09 01 1913
Description: Elevated view of the power house from the southwest showing progress of the brickwork. Two railroad cars are standing on the railroad extension. Workers ar...
Photograph

Putting in Concrete for Apron of Power Dam

Date: 05 17 1912
Description: Elevated view of workers using shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in...
Photograph

Crane Hoisting Gravel into Concrete Mixer

Date: 05 31 1912
Description: Workers maneuvering a load of gravel into a concrete mixer at the plant on the east bank of the river. The east abutment is in the foreground, left.
Photograph

Looking Upstream through Lock at Power Dam

Date: 11 01 1913
Description: Wooden forms are in place for construction of the walls of the lock at the Prairie du Sac dam. The newly constructed power house is on the left.