Date: | 03 1911 |
---|---|
Description: | Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are in the distance. |
Date: | 03 03 1912 |
---|---|
Description: | Two women and a man posing among the timber pilings near the east shore of the river. Wooden concrete forms and two buildings are in the background. |
Date: | 05 03 1912 |
---|---|
Description: | Workmen on a barge using a pulley to raise sheet steel pilings which were damaged by high water in October, 1911. |
Date: | 05 17 1912 |
---|---|
Description: | Workmen pouring concrete from the elevated railroad into forms below. |
Date: | 06 16 1912 |
---|---|
Description: | Elevated view of steam powered pile drivers at work on the coffer dam. |
Date: | 09 30 1912 |
---|---|
Description: | Pile drivers working within the confines of the coffer dam. Men are on the high trestle constructing chutes for pouring concrete. |
Date: | 10 17 1912 |
---|---|
Description: | Concrete plant at east end of the dam, showing the mixers, crane, and a rail car at the abutment. |
Date: | 11 02 1912 |
---|---|
Description: | Workmen using a crane to erect the gate guides for the power house. |
Date: | 11 02 1912 |
---|---|
Description: | Workmen posing during erection of the draft tubes for the power house at the Prairie du Sac dam. |
Date: | 11 21 1912 |
---|---|
Description: | Elevated view within the coffer dam showing four steel draft tubes; wooden supports are visible inside one of the tubes. |
Date: | 11 21 1912 |
---|---|
Description: | Workmen posing on and in front of the steel draft tubes. The gate guides are visible on the right. |
Date: | 03 11 1913 |
---|---|
Description: | Workers posing by a piling coated with sand suspended from a crane. |
Date: | 05 17 1913 |
---|---|
Description: | Progress on the power house construction, with the east portion of the wall complete, and men working on forms for the rest of the wall. |
Date: | 05 28 1913 |
---|---|
Description: | Completed east portion of the first story of the generator room of the power house. Forms are in place at the west end. |
Date: | 05 28 1913 |
---|---|
Description: | Workmen on temporary walkways among reinforcing bars on the roof of the power house. |
Date: | 06 29 1913 |
---|---|
Description: | View from the west bank of the Wisconsin River showing progress on the power dam. The narrow gauge track is visible in the foreground. |
Date: | 07 29 1913 |
---|---|
Description: | A view of the power house from the southwest, showing bricklayers and other workers. The narrow gauge railroad is in the foreground. |
Date: | 09 01 1913 |
---|---|
Description: | Elevated view of the power house from the southwest showing progress of the brickwork. Two railroad cars are standing on the railroad extension. Workers ar... |
Date: | 10 10 1913 |
---|---|
Description: | Workers posing with roof trusses on the power house, 85 feet above the water level at the Prairie du Sac Dam. Note the brickwork in progress. |
Date: | 11 01 1913 |
---|---|
Description: | Elevated view from the hill, looking northeast at the power house at the Prairie du Sac dam. Much of the brickwork has been completed. Concrete forms for t... |