Date: | 03 03 1926 |
---|---|
Description: | Orpheum Theater, 216 State Street, under construction, looking east, showing the back sides of buildings along State Street. |
Date: | 07 1908 |
---|---|
Description: | Workmen with teams of horses excavate for the new Mercantile Store, later the M.M. Smart Store. A woman is walking on the street nearby, and a boy or man w... |
Date: | 07 1908 |
---|---|
Description: | Workmen with teams of horses excavate for the new Mercantile Store, later the M.M. Smart Store. |
Date: | 1900 |
---|---|
Description: | Elevated view of a construction site surrounded by buildings in what appears to be an industrial area. A sign on the building on the left side of reads: "W... |
Date: | 1914 |
---|---|
Description: | After his success with the State Street and Pinckney Street car dealerships, Louis Schoelkopf built a new building at 210 E. Washington Avenue. The constru... |
Date: | 1914 |
---|---|
Description: | View across street towards two men standing in front of the Schoelkopf dealership at 210 E. Washington Avenue as construction progresses on the three-story... |
Date: | 1914 |
---|---|
Description: | View across street towards the construction at 210 E. Washington Avenue. There is scaffolding in front of the building, and Emma Schoelkopf is standing in ... |
Date: | 1914 |
---|---|
Description: | Another view of the Schoelkopf construction site at 210 E. Washington Avenue. Two men stand in the street in front, one of whom may be Louis Schoelkopf. Th... |
Date: | 1914 |
---|---|
Description: | View of group of men, and a young boy, gathered for a group portrait in front of the 210 E. Washington Avenue dealership. The Schoelkopf name has been adde... |
Date: | 1903 |
---|---|
Description: | Two men are standing and posing beside the cornerstone of the Eau Claire Public Library. A third man is standing on the far left just above and behind the ... |
Date: | 1903 |
---|---|
Description: | View looking down toward construction workers moving a stone slab for the facade into place during the construction of the Eau Claire Public Library at Far... |
Date: | |
---|---|
Description: | A construction site with a view of the excavated foundation and the street level. At the street level are buildings, people, and horse-drawn wagons. One ma... |
Date: | |
---|---|
Description: | A construction site with a view of the excavated foundation and the street level. At the street level are buildings, people, a crane, construction shacks, ... |
Date: | |
---|---|
Description: | A construction site with a view of the excavated foundation and the street level. At the street level are buildings, people, a crane, construction shacks, ... |
Date: | 1914 |
---|---|
Description: | View of the construction site of the Glander Building on the northeast corner of S. 9th and Washington Streets. A masonry crew is constructing the foundati... |
Date: | 1914 |
---|---|
Description: | View across street towards a group of children standing in front of the Glander Building under construction on the northeast corner of S. 9th and Washingto... |
Date: | 1930 |
---|---|
Description: | Construction site of the Wisconsin Power and Light Co. Office Building & Bus Station. The address of the bus station was 122 West Washington Avenue, but th... |
Date: | |
---|---|
Description: | A man wearing a hat and carrying a coat over his arm is standing in the left foreground. Beyond is a town, with a building under construction. Caption read... |