Date: | 08 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue. Men are pouring a cement floor. |
Date: | 05 17 1912 |
---|---|
Description: | Workmen pouring concrete from the elevated railroad into forms below. |
Date: | 09 30 1912 |
---|---|
Description: | Pile drivers working within the confines of the coffer dam. Men are on the high trestle constructing chutes for pouring concrete. |
Date: | 10 17 1912 |
---|---|
Description: | Concrete plant at east end of the dam, showing the mixers, crane, and a rail car at the abutment. |
Date: | 05 17 1912 |
---|---|
Description: | Elevated view of workers using shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in... |
Date: | 07 01 1912 |
---|---|
Description: | A view through the runway (tunnel) cast into the concrete structure of the power dam at Prairie du Sac. |
Date: | 07 21 1942 |
---|---|
Description: | Men pouring and smoothing cement on the construction site of the Ordnance Steel Foundry Company. The Foundry may have served as part of International Harve... |
Date: | 1953 |
---|---|
Description: | A man uses an International RF-190 series truck with a cement mixer platform body while parked in front of a partially built structure. |
Date: | 05 23 1936 |
---|---|
Description: | Elevated, panoramic view across water towards the Norris Dam. Portions of the image are labeled. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: