Date: | |
---|---|
Description: | Two men shaking hands while working to complete structural steel work on the Wisconsin State Capitol. |
Date: | 1909 |
---|---|
Description: | Workmen posing on the partially demolished dome of the third Wisconsin State Capitol, together with the hoist used for removing salvaged materials. This d... |
Date: | |
---|---|
Description: | Lumber workers laying railroad tracks through the woods. |
Date: | 1963 |
---|---|
Description: | A man excavating with a British built International BTD-6 crawler tractor and Drott bucketloader in front of the west facade of St. Paul's Cathedral in Lon... |
Date: | 1937 |
---|---|
Description: | Worker moving rock at the Sahara Mine with an International T-40 TracTracTor (crawler tractor) equipped with a Bucyrus-Erie bullgrader. |
Date: | 04 06 1938 |
---|---|
Description: | Original caption reads: "Model TD-65 Diesel TracTracTor [crawler tractor] owned by the Albert Brothers, and working on the Sky Line Drive. This tractor is ... |
Date: | 08 25 1967 |
---|---|
Description: | Construction workers enjoying a beer after pouring concrete for a bridge structure. |
Date: | 1929 |
---|---|
Description: | Workers are looking on as a Bucyrus Erie excavating crane is loading dirt into the bed of an International heavy-duty dump truck. |
Date: | 07 1914 |
---|---|
Description: | Starting to raise "Wisconsin" statue onto the dome of the Wisconsin State Capitol (the fourth State Capitol, the third in Madison, 1906 - ). The gilded bro... |
Date: | 1900 |
---|---|
Description: | Elevated view of construction workers and brick layers nearing completion of construction of the Twine Mill at the McCormick Reaper Works. The factory was ... |
Date: | 08 1907 |
---|---|
Description: | The dismantling of the dome of the third Wisconsin State Capitol began with the removal of the 32-foot flagpole. The eagle at the top of the pole was an 18... |
Date: | 1883 |
---|---|
Description: | The third Wisconsin State Capitol after the unfinished South Wing collapsed on November 8, 1883. Defective workmanship and shoddy construction materials ca... |
Date: | 1910 |
---|---|
Description: | Group portrait of the crew that constructed the Wisconsin State Capitol dome. The new East Wing is visible in the background. |
Date: | 1905 |
---|---|
Description: | Construction crew building a double streetcar track around the Capitol Square on North Pinckney Street. The oversized awnings were common around the Square... |
Date: | 1949 |
---|---|
Description: | Construction worker clears trees along a hillside with an International diesel TD-24 TracTracTor (crawler tractor). |
Date: | 08 16 1984 |
---|---|
Description: | Young men, workers for the Carson & Barnes Circus, carrying heavy circus tent poles through a field. |
Date: | |
---|---|
Description: | Construction workers sitting atop a steel girder placed by a crane, bolting it together at the corners. |
Date: | |
---|---|
Description: | Workers from Starkweather Contractors repair and install windows at a residence. |
Date: | 1909 |
---|---|
Description: | Close-up of the demolition of the dome of the Third Capitol, one of the few known photographs that permits such close observation of the architectural deta... |
Date: | 1955 |
---|---|
Description: | A man wearing a construction workers' union sign pickets in the bright sun, followed by a young boy with a homemade sign of support. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: