Date: | 1940 |
---|---|
Description: | McCormick-Deering #42 combine connected to a testing apparatus at International Harvester's East Moline Works. The factory was constructed in 1933 and was ... |
Date: | 08 1907 |
---|---|
Description: | The dismantling of the dome of the third Wisconsin State Capitol began with the removal of the 32-foot flagpole. The eagle at the top of the pole was an 18... |
Date: | 1913 |
---|---|
Description: | Dam and hydroelectric power house, with a billowing smokestack and a crane in the background. |
Date: | |
---|---|
Description: | Workers pose on the frame of a barn they are building. |
Date: | |
---|---|
Description: | Elevated view of several industrial buildings near water, and in the background are fences on a slope, and at the top of the hill are buildings and what ma... |
Date: | |
---|---|
Description: | A wagon is being raised or lowered at a construction site. The wagon has chains looped around the axle of each wheel as a man below signals directions. He ... |
Date: | |
---|---|
Description: | A construction site with a view of the excavated foundation and the street level. At the street level are buildings, people, and horse-drawn wagons. One ma... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: