Date: | 12 31 1961 |
---|---|
Description: | Farmall 460 tractor with windbreaker and no. 46 baler removing twenty tons of hay from Green Bay City Stadium (now Lambeau Field) at 9 a.m. on the day of t... |
Date: | 1966 |
---|---|
Description: | Two workers filling a railroad cooling car with ice from an International truck at a railroad yard. |
Date: | |
---|---|
Description: | Men pose on and around a large steam engine locomotive and mineral cars(?) in front of a factory with tall smokestacks. The side of the engine reads: "Calu... |
Date: | 1961 |
---|---|
Description: | International TD-30 crawler tractor (TracTracTor) working to widen U.S. Highway 40 near Berthoud Pass in Colorado. The highway wound through the Rocky Moun... |
Date: | 1963 |
---|---|
Description: | Bob Johnson and Karl Kordas standing in front of the Hough D500 paydozer they helped to assemble. They are likely standing on the grounds of the Frank G. H... |
Date: | 1958 |
---|---|
Description: | Farmer H.L. Bavender with cows and a dog on his farm. |
Date: | 1958 |
---|---|
Description: | Farmer Hubert Hill using a Farmall 300 tractor with a front-end loader to control a flock of turkeys. The original caption reads: "Hubert Hill's elevated f... |
Date: | 1958 |
---|---|
Description: | Construction worker Buddis Stone at the site of the Mammoth Pool Dam along the San Joaquin River in the Sierra Nevada Mountains. Stone bored holes for expl... |
Date: | 1958 |
---|---|
Description: | Construction workers O.R. Williams, Fred Mappin, and Rober Garner at the site of the Mammoth Pool Dam on the San Joaquin River in the Sierra Nevada Mountai... |
Date: | 1957 |
---|---|
Description: | Elevated view of part of a five-man assembly team working on the body of an International A-100 "Golden Jubilee" truck. The fender-grille unit is dropping ... |
Date: | 1957 |
---|---|
Description: | Elevated view of part of a five-man assembly team working on the body of an International A-100 "Golden Jubilee" truck. The fender-grille unit is dropping ... |
Date: | 1957 |
---|---|
Description: | Elevated view of a five-man assembly team working on the body of an A-100 "Golden Jubilee" truck. The fender-grille unit is dropping through an opening in ... |
Date: | 1957 |
---|---|
Description: | Elevated view of a five-man assembly team working to assemble the cab and chassis of an International A-100 "Golden Jubilee" truck at International Harvest... |
Date: | 1957 |
---|---|
Description: | Elevated view of a five-man assembly team working to assemble the cab and chassis of an International A-100 "Golden Jubilee" truck at International Harvest... |
Date: | 1957 |
---|---|
Description: | Harlan Riegel installs a chrome bumper on an International A-100 "Golden Jubilee" truck while holding a tool in his mouth at International Harvester's Spri... |
Date: | 1957 |
---|---|
Description: | Two factory workers remove an International A-100 "Golden Jubilee" truck hood from a press at Springfield Works. The hoods took shape from flat sheets of... |
Date: | 1957 |
---|---|
Description: | Two factory workers remove an International A-100 "Golden Jubilee" truck hood from a press at Springfield Works. The hoods took shape from flat sheets of s... |
Date: | 1957 |
---|---|
Description: | Factory workers take an Internatioanl A-100 "Golden Jubilee" truck hood from a press at International Harvester's Springfield Works. The hoods took shape... |
Date: | 1957 |
---|---|
Description: | Two factory workers remove an A-100 "Golden Jubilee" truck hood from a press at International Harvester's Springfield Works. The hoods took shape from fla... |
Date: | 1957 |
---|---|
Description: | Floyd Green, a painter at International Harvester's Springfield Works factory, sprays the bottom of an International A-100 "Golden Jubilee" truck from a pi... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: