Date: | 10 17 1912 |
---|---|
Description: | A crowd gathers for the laying of the cornerstone of the Hon. J.S. Tripp Library and Hall. J. Stephen Tripp was a pioneer in Prairie du Sac, a lawyer, and ... |
Date: | 04 14 1911 |
---|---|
Description: | Workers posing inside the forms for the east shore abutment at the power dam site. |
Date: | 04 22 1911 |
---|---|
Description: | Two men and a boy are posing on rail cars carrying two 150 horse-power boilers for use in the temporary power plant at the dam construction site at Prairie... |
Date: | 08 06 1911 |
---|---|
Description: | A view following the lower trestle to the west bank. The construction camp buildings, including the office and temporary power plant are seen on the left. |
Date: | 10 12 1911 |
---|---|
Description: | High water has scattered timber pilings through the construction camp. The office is on the right; the smokestacks of the temporary power plant are behind ... |
Date: | 05 17 1912 |
---|---|
Description: | Elevated view of workers using shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in... |
Date: | 05 31 1912 |
---|---|
Description: | Workers maneuvering a load of gravel into a concrete mixer at the plant on the east bank of the river. The east abutment is in the foreground, left. |
Date: | 07 01 1912 |
---|---|
Description: | A view through the runway (tunnel) cast into the concrete structure of the power dam at Prairie du Sac. |
Date: | 07 16 1912 |
---|---|
Description: | Workers posing inside the coffer dam. The narrow gauge railroad is behind them. One of the pile drivers is in the background. A bare area on the bluff in t... |
Date: | 08 01 1912 |
---|---|
Description: | Elevated view of the power dam construction site from the west, showing the elevated trestle, coffer dam, and steam pile drivers. The concrete plant is vis... |
Date: | 09 30 1912 |
---|---|
Description: | Forms have been removed from the first concrete poured for the power house in the northeast corner of the coffer dam. Men are pouring concrete from rail ca... |
Date: | 01 09 1913 |
---|---|
Description: | Men are standing in the completed draft tubes after removal of the steel forms. |
Date: | 06 13 1913 |
---|---|
Description: | A view, from the west, of the quarry on Blackhawk Bluff. Gravel from the quarry was used in concrete for the construction of the power plant and dam. |
Date: | 07 02 1913 |
---|---|
Description: | Workers pause while installing a maze of conduit for the switchboard in the power house. The construction camp is to the left. |
Date: | 11 01 1913 |
---|---|
Description: | Wooden forms are in place for construction of the walls of the lock at the Prairie du Sac dam. The newly constructed power house is on the left. |
Date: | 1924 |
---|---|
Description: | Aerial view of the Prairie du Sac hydroelectric plant and the surrounding landscape of the Wisconsin River. |
Date: | 1910 |
---|---|
Description: | Elevated view of high water on the Wisconsin River from a bluff on the west bank. The photograph is undated and does not indicate if it was taken prior to ... |
Date: | 1907 |
---|---|
Description: | A view of the west bank of the Wisconsin River at Pounds Landing. This bluff is at the western end of the power dam which was constructed 1911-1914. Captio... |
Date: | 1909 |
---|---|
Description: | Photographer's jewelry store and clock repair shop with a watch-shaped sign in front. In the window are a clock, jewelry box, and a rack with paper goods, ... |
Date: | 05 28 1911 |
---|---|
Description: | Men posing on a barge carrying a steam powered pile driver at work on the coffer dam for the construction of the powerhouse. Caption reads: "Driving Sheet ... |