Date: | 04 01 1938 |
---|---|
Description: | Two men standing against a wall, behind the Fauerbach Brewing Co. Railroad tracks are in the foreground, and Lake Monona is in the background. |
Date: | 05 03 1912 |
---|---|
Description: | Workmen on a barge using a pulley to raise sheet steel pilings which were damaged by high water in October, 1911. |
Date: | 03 19 1940 |
---|---|
Description: | View across Milwaukee River of workers of the Herman M. Hettler Lumber Company unloading lumber off a shipping boat to the Shroeder Lumber Yards and Troste... |
Date: | 05 17 1913 |
---|---|
Description: | Progress on the power house construction, with the east portion of the wall complete, and men working on forms for the rest of the wall. |
Date: | 05 28 1913 |
---|---|
Description: | Workmen on temporary walkways among reinforcing bars on the roof of the power house. |
Date: | 07 29 1913 |
---|---|
Description: | A view of the power house from the southwest, showing bricklayers and other workers. The narrow gauge railroad is in the foreground. |
Date: | 09 01 1913 |
---|---|
Description: | Elevated view of the power house from the southwest showing progress of the brickwork. Two railroad cars are standing on the railroad extension. Workers ar... |
Date: | 10 10 1913 |
---|---|
Description: | Workers posing with roof trusses on the power house, 85 feet above the water level at the Prairie du Sac Dam. Note the brickwork in progress. |
Date: | 03 12 1914 |
---|---|
Description: | Office force and foremen posing in front of the south side of the power house at the Prairie du Sac dam. |
Date: | 03 12 1914 |
---|---|
Description: | The office force and foremen posing before the south facade of the power house at the Prairie du Sac dam. |
Date: | 10 11 1914 |
---|---|
Description: | Elevated view looking east across the power house, lock, and uncompleted portion of the dam. The concrete plant is seen on the far bank. The rising water o... |
Date: | 07 02 1913 |
---|---|
Description: | Workers pause while installing a maze of conduit for the switchboard in the power house. The construction camp is to the left. |
Date: | 07 16 1926 |
---|---|
Description: | Two mud-splattered International trucks with drivers parked in front of a wooden water tank. The tank has a hand-painted sign that reads: "Positively No Sw... |
Date: | 03 09 1938 |
---|---|
Description: | Men using an International T-20 TracTracTor (crawler tractor), PD-80, and P-300 owned by Sam Seppala of Grand Marais, to log white pine. The original capti... |
Date: | 1913 |
---|---|
Description: | Pawling & Harnischfeger 5-ton monorail hoist with a lumber handling unit preparing to load lumber onto a boat in what is possibly Pensacola, Florida. Two m... |
Date: | 1913 |
---|---|
Description: | Pawling & Harnischfeger 5-ton monorail hoist with a lumber handling unit, possibly in Pensacola, Florida. The monorail track extends over the dock to permi... |
Date: | 06 1939 |
---|---|
Description: | Bridge on the Manitowoc River raised to allow the Pere Marquette car ferry through. River dredging equipment can be seen in the foreground. |
Date: | 1940 |
---|---|
Description: | Frank Hurn, driver for Davidson Transfer & Storage Company, wiping the windshield of an International D-40 truck. The truck appears to be parked near a har... |
Date: | 1940 |
---|---|
Description: | Men in a washroom are cleaning an International truck used by Standard Freight Lines, Inc. The original caption reads: "Truck washroom. American Transporta... |
Date: | 08 05 1962 |
---|---|
Description: | Mr. Ortel, a United States Government lock-keeper at Appleton lock number one on the Fox River canal. Mr. Ortel is opening the sluice gates to allow water ... |