Date: | 1889 |
---|---|
Description: | Stereograph of a posed scene showing a woman milking a cow as two other women stand waiting at an open barn door. On the left a man at a hand-pump is behin... |
Date: | 1886 |
---|---|
Description: | Stereograph of men unloading lumber off a raft. A man at the left is loading lumber onto a horse-drawn wagon, while a man in an apron is holding the horses... |
Date: | |
---|---|
Description: | Woman pumping water from a well near the porch of her farmhouse. |
Date: | 1900 |
---|---|
Description: | Southwest panorama of the McCormick Reaper Works factory and rail yard as seen across a canal. Workers can be seen unloading wood. |
Date: | 08 01 1930 |
---|---|
Description: | Basement and ground floor of State Office Building, 1 W. Wilson Street, under construction. View toward Lake Monona. |
Date: | 03 28 1929 |
---|---|
Description: | Men working on the concrete forms for the roof of the addition to the University of Wisconsin hydraulics laboratory, 660 N. Park Street looking north over ... |
Date: | 03 28 1929 |
---|---|
Description: | Elevated view from the south east of men constructing the concrete forms for the roof of the addition to the University of Wisconsin-Madison hydraulics lab... |
Date: | |
---|---|
Description: | Railroad bridge construction at an unknown location somewhere on the Chicago, Milwaukee, and St. Paul Railroad line. There is a church in the background on... |
Date: | |
---|---|
Description: | The head gate at the Big Horn Ditch on the Crow Reservation in northeast Wyoming. Men are working with cranes near a tent with a chimney spewing out smoke. |
Date: | 1911 |
---|---|
Description: | Newly constructed office building at construction site, with buggy in attached shed. |
Date: | 03 1911 |
---|---|
Description: | Construction workers posing during construction of the main office at the Wisconsin River dam site. |
Date: | 03 1911 |
---|---|
Description: | Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are in the distance. |
Date: | 04 14 1911 |
---|---|
Description: | Completed two-story wood frame main office building at the site of the Wisconsin River dam. |
Date: | 04 14 1911 |
---|---|
Description: | Newly poured concrete abutment on the east shore of the Wisconsin River. Iron reinforcing rods protrude from the concrete. Workmen and the steam-driven cem... |
Date: | 04 1911 |
---|---|
Description: | Group of men standing on and beside a rail car in front of the main construction office at the site of the Wisconsin River dam. |
Date: | 06 19 1911 |
---|---|
Description: | Looking west over the Wisconsin River at the unfinished narrow gauge railroad trestle built for construction of the dam. Two pile drivers are seen in the a... |
Date: | 06 21 1911 |
---|---|
Description: | Looking east over the Wisconsin River showing the unfinished narrow gauge railroad trestle. Two steam-driven pile drivers on barges with construction worke... |
Date: | 07 01 1911 |
---|---|
Description: | A steam-powered centrifugal sand pump at work on the Wisconsin River during the construction of the power dam. Pilings of the coffer dam are visible in the... |
Date: | 07 20 1911 |
---|---|
Description: | Workmen stand on a barge carrying a steam-powered pile driver. The pilings will form the coffer dam necessary for construction of the power plant on the Wi... |
Date: | 07 27 1911 |
---|---|
Description: | Elevated view of the power dam construction site on the Wisconsin River from the west shore. The outline of the coffer dam is easily seen. Three steam-pow... |