Date: | |
---|---|
Description: | The head gate at the Big Horn Ditch on the Crow Reservation in northeast Wyoming. Men are working with cranes near a tent with a chimney spewing out smoke. |
Date: | 03 1911 |
---|---|
Description: | Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are in the distance. |
Date: | 04 1911 |
---|---|
Description: | Workmen pose on a steam-powered pile driver at work at the north end of the slough on the Wisconsin River. The railroad was extended from the village to th... |
Date: | 06 19 1911 |
---|---|
Description: | Looking west over the Wisconsin River at the unfinished narrow gauge railroad trestle built for construction of the dam. Two pile drivers are seen in the a... |
Date: | 06 21 1911 |
---|---|
Description: | Looking east over the Wisconsin River showing the unfinished narrow gauge railroad trestle. Two steam-driven pile drivers on barges with construction worke... |
Date: | 07 01 1911 |
---|---|
Description: | A steam-powered centrifugal sand pump at work on the Wisconsin River during the construction of the power dam. Pilings of the coffer dam are visible in the... |
Date: | 08 15 1911 |
---|---|
Description: | Dam site on the Wisconsin river, looking southwest along the unfinished narrow gauge railroad trestle. The coffer dam and two pile drivers are also visible... |
Date: | 03 11 1914 |
---|---|
Description: | Elevated view looking east from the lock at the Prairie du Sac dam. Recently completed buttresses are in the foreground, with earlier stages of constructio... |
Date: | 1915 |
---|---|
Description: | Elevated view of a group of workers posing on the east bank of the Wisconsin River at the power dam construction site. One man is strumming his shovel like... |
Date: | 05 17 1912 |
---|---|
Description: | Elevated view of workers using shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in... |
Date: | 10 04 1946 |
---|---|
Description: | Men work with an International TracTracTor (crawler tractor) in construction of the Merriman Dam. The tractor was owned by S.A. Healy Co., White Plains, Ne... |
Date: | 09 1943 |
---|---|
Description: | Battalion Seabees work on waterfront construction using an International K-line truck. |
Date: | 1931 |
---|---|
Description: | View from shoreline of a crane lifting machinery to workers at the top of the bridge during construction. Words on the crane reads, "Stevens Brothers and S... |
Date: | 1931 |
---|---|
Description: | The entrance to the bridge during construction. A worker works on the side of the bridge on the right. Other workers in the middle of the bridge lay boards... |
Date: | 03 1932 |
---|---|
Description: | An International dump truck empties its load down the side of a canyon during the construction of the Hoover Dam. |
Date: | 03 1932 |
---|---|
Description: | Workers use an International truck to haul building material up and down the dirt roads of a canyon during the construction of the Hoover Dam. |
Date: | 1932 |
---|---|
Description: | Men stand along a riverbank as International trucks are used to haul loads from the cliffs during the construction of the Hoover Dam. An electric shovel is... |
Date: | 03 1932 |
---|---|
Description: | Men use International trucks to loads from the cliffs during the construction of the Hoover Dam. One of the men is smoking a cigarette. Two shovels are wor... |
Date: | 03 1932 |
---|---|
Description: | Two International trucks drive up a dirt road during the construction of the Hoover Dam. |
Date: | 03 1932 |
---|---|
Description: | Men use dynamite, electric shovels, and an International truck to chip canyon walls down during the construction of the Hoover Dam. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: