Date: | 08 01 1930 |
---|---|
Description: | Basement and ground floor of State Office Building, 1 W. Wilson Street, under construction. View toward Lake Monona. |
Date: | 03 28 1929 |
---|---|
Description: | Men working on the concrete forms for the roof of the addition to the University of Wisconsin hydraulics laboratory, 660 N. Park Street looking north over ... |
Date: | 03 28 1929 |
---|---|
Description: | Elevated view from the south east of men constructing the concrete forms for the roof of the addition to the University of Wisconsin-Madison hydraulics lab... |
Date: | |
---|---|
Description: | Railroad bridge construction at an unknown location somewhere on the Chicago, Milwaukee, and St. Paul Railroad line. There is a church in the background on... |
Date: | |
---|---|
Description: | The head gate at the Big Horn Ditch on the Crow Reservation in northeast Wyoming. Men are working with cranes near a tent with a chimney spewing out smoke. |
Date: | 03 1911 |
---|---|
Description: | Construction workers posing during construction of the main office at the Wisconsin River dam site. |
Date: | 03 1911 |
---|---|
Description: | Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are in the distance. |
Date: | 04 14 1911 |
---|---|
Description: | Newly poured concrete abutment on the east shore of the Wisconsin River. Iron reinforcing rods protrude from the concrete. Workmen and the steam-driven cem... |
Date: | 04 1911 |
---|---|
Description: | Group of men standing on and beside a rail car in front of the main construction office at the site of the Wisconsin River dam. |
Date: | 06 19 1911 |
---|---|
Description: | Looking west over the Wisconsin River at the unfinished narrow gauge railroad trestle built for construction of the dam. Two pile drivers are seen in the a... |
Date: | 06 21 1911 |
---|---|
Description: | Looking east over the Wisconsin River showing the unfinished narrow gauge railroad trestle. Two steam-driven pile drivers on barges with construction worke... |
Date: | 07 01 1911 |
---|---|
Description: | A steam-powered centrifugal sand pump at work on the Wisconsin River during the construction of the power dam. Pilings of the coffer dam are visible in the... |
Date: | 07 20 1911 |
---|---|
Description: | Workmen stand on a barge carrying a steam-powered pile driver. The pilings will form the coffer dam necessary for construction of the power plant on the Wi... |
Date: | 07 27 1911 |
---|---|
Description: | Elevated view of the power dam construction site on the Wisconsin River from the west shore. The outline of the coffer dam is easily seen. Three steam-pow... |
Date: | 08 15 1911 |
---|---|
Description: | Dam site on the Wisconsin river, looking southwest along the unfinished narrow gauge railroad trestle. The coffer dam and two pile drivers are also visible... |
Date: | 10 07 1911 |
---|---|
Description: | Elevated view of the rising waters of the Wisconsin River at the construction site. This view shows the coffer dam, pile drivers, and narrow gauge railroad... |
Date: | 10 07 1911 |
---|---|
Description: | Two men in a boat approaching a wooden gravel bin at the construction site. Other men are watching from atop the structure and from the shore. |
Date: | 04 13 1912 |
---|---|
Description: | The concrete mixer standing near the newly poured east shore abutment while men are working nearby. Reinforcing rods protrude from the abutment. |
Date: | 04 13 1912 |
---|---|
Description: | Workmen operating a steam shovel loading gravel into electric rail cars during construction of the power dam. |
Date: | 05 03 1912 |
---|---|
Description: | Workmen on a barge using a pulley to raise sheet steel pilings which were damaged by high water in October, 1911. |