Date: | 1884 |
---|---|
Description: | View across water of a Milwaukee, Lake Shore, and Western Railroad locomotive (No #33) pulling a pay car across a trestle over the Fox River. Several large... |
Date: | 1900 |
---|---|
Description: | Southwest panorama of the McCormick Reaper Works factory and rail yard as seen across a canal. Workers can be seen unloading wood. |
Date: | 1903 |
---|---|
Description: | A work crew of the Upham Lumber and Manufacturing Company near Athens, Wisconsin. The men are riding on a flatbed car of the Abbottsford and Northeastern R... |
Date: | 1911 |
---|---|
Description: | Workers erecting a steam driven pile driver while others survey for the railroad extension from the village of Prairie du Sac to the dam site on the Wiscon... |
Date: | 03 1911 |
---|---|
Description: | Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are in the distance. |
Date: | 04 1911 |
---|---|
Description: | Group of men standing on and beside a rail car in front of the main construction office at the site of the Wisconsin River dam. |
Date: | 04 13 1912 |
---|---|
Description: | Workmen operating a steam shovel loading gravel into electric rail cars during construction of the power dam. |
Date: | 05 17 1912 |
---|---|
Description: | Workmen pouring concrete from the elevated railroad into forms below. |
Date: | 05 31 1912 |
---|---|
Description: | Forms have been removed, revealing the newly poured buttresses and apron. A man is pushing a cart on the elevated road. |
Date: | 11 21 1912 |
---|---|
Description: | Two workmen standing in the outlet of a steel draft tube in the power house, while other men are working above it. Cars are moving along the elevated trest... |
Date: | 1915 |
---|---|
Description: | Elevated view of a group of workers posing on the east bank of the Wisconsin River at the power dam construction site. One man is strumming his shovel like... |
Date: | 04 22 1911 |
---|---|
Description: | Two men and a boy are posing on rail cars carrying two 150 horse-power boilers for use in the temporary power plant at the dam construction site at Prairie... |
Date: | 09 30 1912 |
---|---|
Description: | Forms have been removed from the first concrete poured for the power house in the northeast corner of the coffer dam. Men are pouring concrete from rail ca... |
Date: | |
---|---|
Description: | View of a barge transporting railroad cars and an engine across a river. Several men are on the barge, including one on an overhead structure. Text on phot... |
Date: | |
---|---|
Description: | Letterhead of the West Side Fuel Company of Port Washington, Wisconsin, with cartoon-style drawings, printed in black ink, of workers mining coal with a pi... |
Date: | |
---|---|
Description: | Some towering hand-made genius had fighting words to sell |
Date: | 1909 |
---|---|
Description: | Elevated view of a work train on railroad tracks on a railroad bridge, over a river, that is under construction. Several workmen are standing and posing on... |
Date: | 1909 |
---|---|
Description: | Elevated view of several workmen standing on a platform near the shoreline of the Wisconsin River during construction of a railroad bridge. There is a work... |