Date: | 09 26 1933 |
---|---|
Description: | A.H. Hubbell Company workers build a "Complete Plibrico Jointless Firebrick Lining" brick wall around a boiler in the engine room at Arcade Manufacturing C... |
Date: | 1950 |
---|---|
Description: | A man in work clothes gets ready to shove a log into the fire chamber of a boiler. |
Date: | 06 1911 |
---|---|
Description: | Workmen pose during construction of the temporary steam power plant at the Prairie du Sac dam. These engines provided electric power for the construction ... |
Date: | 06 21 1911 |
---|---|
Description: | Looking east over the Wisconsin River showing the unfinished narrow gauge railroad trestle. Two steam-driven pile drivers on barges with construction worke... |
Date: | 07 27 1911 |
---|---|
Description: | Elevated view of the power dam construction site on the Wisconsin River from the west shore. The outline of the coffer dam is easily seen. Three steam-pow... |
Date: | 07 16 1912 |
---|---|
Description: | Workmen pose around the "big boiler" and engine that power the 12 inch centrifugal pump used to pump out the coffer dam at the power dam construction site. |
Date: | 1915 |
---|---|
Description: | Elevated view of a group of workers posing on the east bank of the Wisconsin River at the power dam construction site. One man is strumming his shovel like... |
Date: | 05 31 1912 |
---|---|
Description: | Workers maneuvering a load of gravel into a concrete mixer at the plant on the east bank of the river. The east abutment is in the foreground, left. |
Date: | 07 16 1912 |
---|---|
Description: | Workers posing inside the coffer dam. The narrow gauge railroad is behind them. One of the pile drivers is in the background. A bare area on the bluff in t... |