Date: | 02 20 1963 |
---|---|
Description: | Union members of Local 317 in Milwaukee strike outside the Electric Co.'s N. Edison Street plant. It was a very cold night. |
Date: | 04 11 1946 |
---|---|
Description: | Wisconsin Power & Light Company banquet for Veteran employees at the Hotel Loraine. |
Date: | 04 12 1946 |
---|---|
Description: | Group portrait of linemen and polemen, Wisconsin Power & Light Company, at the Park Hotel. |
Date: | 06 15 1945 |
---|---|
Description: | Group portrait of C.L. Turner, traffic supervisor for Wisconsin Power & Light Company, and six female employees of Wisconsin Power & Light Company, 122 Wes... |
Date: | |
---|---|
Description: | Panoramic group portrait of workers, who are building the Penisular Power Company, located on the Brule River. |
Date: | 1959 |
---|---|
Description: | Men working around an International pickup truck parked at a construction site. The truck, possibly a B-120 or B-130, was owned by Carson Contractors. |
Date: | 04 10 1948 |
---|---|
Description: | Group portrait of men attending an informational meeting of the Wisconsin Power & Light Company, Central Wisconsin Adequate Wiring Bureau at the Loraine Ho... |
Date: | 08 09 1927 |
---|---|
Description: | Men working along a road with a modified McCormick-Deering 10-20 industrial tractor with attached trailor and post hole digging rig. The men work for Shipp... |
Date: | 08 11 1910 |
---|---|
Description: | The first machinery at work sounding at the site for the power dam. Workmen are posing near the carriage-mounted equipment. A horse-drawn wagon is in the ... |
Date: | 1911 |
---|---|
Description: | Workers erecting a steam driven pile driver while others survey for the railroad extension from the village of Prairie du Sac to the dam site on the Wiscon... |
Date: | 1911 |
---|---|
Description: | Steam-powered pile driver and centrifugal pump (in shed) at work at the Wisconsin River dam site. Men and children are watching the work. |
Date: | 03 1911 |
---|---|
Description: | Construction workers posing during construction of the main office at the Wisconsin River dam site. |
Date: | 03 1911 |
---|---|
Description: | Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are in the distance. |
Date: | 03 1911 |
---|---|
Description: | A gasoline-powered launch tows a barge loaded with log pilings on the Wisconsin River to the Prairie du Sac dam site. Workmen drive the launch and guide th... |
Date: | 04 1911 |
---|---|
Description: | Workmen pose on a steam-powered pile driver at work at the north end of the slough on the Wisconsin River. The railroad was extended from the village to th... |
Date: | 04 14 1911 |
---|---|
Description: | Newly poured concrete abutment on the east shore of the Wisconsin River. Iron reinforcing rods protrude from the concrete. Workmen and the steam-driven cem... |
Date: | 05 06 1911 |
---|---|
Description: | Workmen posing while erecting the first smokestack at the power plant construction site on the Wisconsin River. Two men have scaled the stack. |
Date: | 06 1911 |
---|---|
Description: | Workmen pose during construction of the temporary steam power plant at the Prairie du Sac dam. These engines provided electric power for the construction ... |
Date: | 06 10 1911 |
---|---|
Description: | Dining rooms and kitchen at the camp on the construction site of the Prairie du Sac dam. Workers and children pose in front of the dining rooms; there are ... |
Date: | 06 19 1911 |
---|---|
Description: | Looking west over the Wisconsin River at the unfinished narrow gauge railroad trestle built for construction of the dam. Two pile drivers are seen in the a... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: