Date: | |
---|---|
Description: | Barn raising. The foundation is constructed from local fieldstone or "pudding stone," found in the nearby fields. A large group of men are is posing holdin... |
Date: | 07 23 1931 |
---|---|
Description: | Capital Times model home under construction at 2318 Monroe Street. |
Date: | |
---|---|
Description: | Lumber workers laying railroad tracks through the woods. |
Date: | |
---|---|
Description: | Men working on the dam at Munger's Mill. |
Date: | |
---|---|
Description: | Elevated view of Kilbourn Dam, building apron. Men are working on the dam, and a bridge is in the background. |
Date: | 1883 |
---|---|
Description: | The third Wisconsin State Capitol after the unfinished South Wing collapsed on November 8, 1883. Defective workmanship and shoddy construction materials ca... |
Date: | 1950 |
---|---|
Description: | People gather around a table of food for the First Unitarian Society's "Work Day". The building was designed by Frank Lloyd Wright and some of the construc... |
Date: | 1905 |
---|---|
Description: | Construction crew building a double streetcar track around the Capitol Square on North Pinckney Street. The oversized awnings were common around the Square... |
Date: | 12 19 1936 |
---|---|
Description: | View across street towards a three-story house on Bernard Court. The address on the door reads "202," and a sled is leaning up against the wall near the fr... |
Date: | 11 21 1936 |
---|---|
Description: | Three men on scaffolding are installing Capitol Rock Wool insulation, from a R.H. and E.H. Carpenter Inc. truck into a house at 616 N. Carroll Street. |
Date: | 12 26 1930 |
---|---|
Description: | Rear addition to Wisconsin Telephone Co., 17 S. Fairchild Street. Part of the Loraine Hotel is on the left. |
Date: | 08 01 1928 |
---|---|
Description: | View looking north from corner of Monona Avenue and Wilson Street of front and side of the building, with workmen finishing the basement level. Automobiles... |
Date: | 07 02 1930 |
---|---|
Description: | State Office Building, Wilson Street, construction showing concrete mixer, workers, and a Castle & Doyle truck dumping. |
Date: | 06 07 1930 |
---|---|
Description: | Basement of State Office Building, 1 W. Wilson Street, under construction, facing towards Wilson Street. |
Date: | 08 01 1930 |
---|---|
Description: | Basement and ground floor of State Office Building, 1 W. Wilson Street, under construction. View toward Lake Monona. |
Date: | 03 13 1930 |
---|---|
Description: | Franklin School, 305 West Lakeside Street, showing installation of novoid corkboard on the roof. |
Date: | 08 28 1929 |
---|---|
Description: | Five men are working on the heat tunnel construction for the Lake View TB sanatorium. 1202 Northport Drive. |
Date: | 08 28 1929 |
---|---|
Description: | Steam shovel operators excavate for the construction of the Lake View Tuberculosis Sanitarium boiler house at 1202 Northport Drive. |
Date: | 08 19 1929 |
---|---|
Description: | Workers lay pipe and repave University Avenue, looking east along the 2400 block. |
Date: | 08 22 1929 |
---|---|
Description: | Steam shovel loading a truck as part of road construction in front of Collins Lumber Co., 2308 University Avenue. There is a horse-drawn wagon passing by. ... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: