Date: | 01 02 1929 |
---|---|
Description: | Interior view of first floor lobby with construction debris and some tile work completed on the floor. In the background a man is standing on a ladder near... |
Date: | 07 24 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant, 130 Fair Oaks Avenue, view looking south west. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 10 11 1928 |
---|---|
Description: | View looking up Fairchild Street towards the Wisconsin Power and Light building, at 122 W. Washington Avenue, under construction, with a man working near a... |
Date: | 1954 |
---|---|
Description: | Man working on a suburban road with an International ID-6 and attached loader. The loader was manufactured by the Frank G. Hough Company. |
Date: | 1950 |
---|---|
Description: | Hough HE Payloader loading snow into a truck. The HE was built by Frank G. Hough Company, a Libertyville, Illinois, manufacturer of construction equipment. |
Date: | |
---|---|
Description: | Men constructing a building, or laying a foundation for the post-flood business district dam, using steam-powered machinery in front of the Merchants Hotel... |
Date: | 10 17 1945 |
---|---|
Description: | Two Capital Decorating Company employees on a scaffold painting window frames in the Park Hotel, 22 South Carroll Street. A man can be seen looking out of ... |
Date: | 08 11 1910 |
---|---|
Description: | The first machinery at work sounding at the site for the power dam. Workmen are posing near the carriage-mounted equipment. A horse-drawn wagon is in the ... |
Date: | 1911 |
---|---|
Description: | Workers erecting a steam driven pile driver while others survey for the railroad extension from the village of Prairie du Sac to the dam site on the Wiscon... |
Date: | 1911 |
---|---|
Description: | Steam-powered pile driver and centrifugal pump (in shed) at work at the Wisconsin River dam site. Men and children are watching the work. |
Date: | 03 1911 |
---|---|
Description: | Construction workers posing during construction of the main office at the Wisconsin River dam site. |
Date: | 03 1911 |
---|---|
Description: | Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are in the distance. |
Date: | 04 1911 |
---|---|
Description: | Workmen pose on a steam-powered pile driver at work at the north end of the slough on the Wisconsin River. The railroad was extended from the village to th... |
Date: | 04 14 1911 |
---|---|
Description: | Newly poured concrete abutment on the east shore of the Wisconsin River. Iron reinforcing rods protrude from the concrete. Workmen and the steam-driven cem... |
Date: | 06 19 1911 |
---|---|
Description: | Looking west over the Wisconsin River at the unfinished narrow gauge railroad trestle built for construction of the dam. Two pile drivers are seen in the a... |
Date: | 06 21 1911 |
---|---|
Description: | Looking east over the Wisconsin River showing the unfinished narrow gauge railroad trestle. Two steam-driven pile drivers on barges with construction worke... |
Date: | 07 01 1911 |
---|---|
Description: | A steam-powered centrifugal sand pump at work on the Wisconsin River during the construction of the power dam. Pilings of the coffer dam are visible in the... |
Date: | 07 20 1911 |
---|---|
Description: | Workmen stand on a barge carrying a steam-powered pile driver. The pilings will form the coffer dam necessary for construction of the power plant on the Wi... |