Date: | 10 12 1911 |
---|---|
Description: | High water has scattered timber pilings through the construction camp. The office is on the right; the smokestacks of the temporary power plant are behind ... |
Date: | 07 02 1913 |
---|---|
Description: | Workers pause while installing a maze of conduit for the switchboard in the power house. The construction camp is to the left. |
Date: | |
---|---|
Description: | A group of men constructing a bungalow at University Settlement Camp. Three ladders are being used and five men are on the roof. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: