Date: | 01 02 1929 |
---|---|
Description: | Interior view of first floor lobby with construction debris and some tile work completed on the floor. In the background a man is standing on a ladder near... |
Date: | 09 07 1930 |
---|---|
Description: | University of Wisconsin-Madison Mechanical Engineering Building at 1513 University Avenue under construction. Men are working on the steel framework. A mas... |
Date: | 09 04 1929 |
---|---|
Description: | Addition to State Bank of Wisconsin under construction, with construction workers. 1 W. Main Street. |
Date: | 08 28 1929 |
---|---|
Description: | Five men are working on the heat tunnel construction for the Lake View TB sanatorium. 1202 Northport Drive. |
Date: | 07 24 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant, 130 Fair Oaks Avenue, view looking south west. |
Date: | 08 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue. Men are pouring a cement floor. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 09 04 1926 |
---|---|
Description: | Orpheum Theater construction, 216 State Street, from stage, looking south. |
Date: | 10 04 1926 |
---|---|
Description: | Orpheum Theater under construction, 216 State Street, from upper balcony. A man looking up at the ceiling rafters is standing on top of scaffolding in the ... |
Date: | 02 24 1950 |
---|---|
Description: | A group of workmen posing in front of the First Unitarian Society Meeting House during construction. This is one of two "work days" the men donated to the ... |
Date: | 03 27 1947 |
---|---|
Description: | Wisconsin Telephone Co. building site, 122 West Main Street, looking north across basement and first floor with part of the second floor under construction... |
Date: | 1890 |
---|---|
Description: | Demolished building with a group of men standing on the rubble. |
Date: | 04 14 1911 |
---|---|
Description: | Completed two-story wood frame main office building at the site of the Wisconsin River dam. |
Date: | 05 09 1912 |
---|---|
Description: | Men with shovels working downstream from the east abutment, while other men are looking on. |
Date: | 1915 |
---|---|
Description: | Elevated view of a group of workers posing on the east bank of the Wisconsin River at the power dam construction site. One man is strumming his shovel like... |
Date: | 1914 |
---|---|
Description: | A group of workmen posing while working on concrete forms at the Prairie du Sac dam site. Their position high above the water level affords an expansive up... |
Date: | 04 14 1911 |
---|---|
Description: | Workers posing inside the forms for the east shore abutment at the power dam site. |
Date: | 05 17 1912 |
---|---|
Description: | Elevated view of workers using shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in... |
Date: | 1942 |
---|---|
Description: | Construction site showing an additional to an International Harvester factory, probably the company's Bettendorf Tank Arsenal. |
Date: | 07 1908 |
---|---|
Description: | Workmen with teams of horses excavate for the new Mercantile Store, later the M.M. Smart Store. |