Date: | 03 03 1926 |
---|---|
Description: | Orpheum Theater under construction, 216 State Street, looking west. Also shows Holy Redeemer Catholic Church, 128 W. Johnson Street, Holy Redeemer Rectory,... |
Date: | 08 29 1930 |
---|---|
Description: | Two cranes and a car at the bridge construction site. Several workers work on carving out the road at the edge of the river. |
Date: | 04 03 1957 |
---|---|
Description: | Elevated view of demonstration “ranch” type frame residence under construction within an auditorium, presumably in Milwaukee, for some type of trade show. ... |
Date: | 12 13 1957 |
---|---|
Description: | Automobile at the entrance of the recently opened Doty Street parking ramp. The driver, David O'Neil, is being ushered into the ramp by Traffic Engineer Jo... |
Date: | 05 18 1959 |
---|---|
Description: | Model Marlyn Sachtjen paddling around in the 16 by 32 foot pool which was constructed on the Capitol Park overlooking State Street. Ruth Andres sits at the... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: