Date: | 10 07 1911 |
---|---|
Description: | Workers attempt to secure the trestle against high water on the Wisconsin River during construction of the power dam. |
Date: | 10 07 1911 |
---|---|
Description: | Two men in a boat approaching a wooden gravel bin at the construction site. Other men are watching from atop the structure and from the shore. |
Date: | 10 11 1911 |
---|---|
Description: | Elevated view of high water on the Wisconsin River which has inundated the coffer dam at the construction site. The narrow gauge railroad (curved line in f... |
Date: | 10 12 1911 |
---|---|
Description: | High water on the Wisconsin River has submerged the coffer dam and trestle. Two pile drivers remain in place. Log pilings are floating near the western sh... |
Date: | 10 12 1911 |
---|---|
Description: | Two men are standing on the tracks of the newly constructed railroad extension to the construction site of the Prairie du Sac dam. Behind them, the tracks... |
Date: | 10 18 1911 |
---|---|
Description: | Receding flood waters reveal destruction of the railroad extension to the power dam construction site. |
Date: | 10 18 1911 |
---|---|
Description: | Workmen standing on damaged and partly submerged railroad track on the west shore of the Wisconsin River. |
Date: | 11 05 1911 |
---|---|
Description: | A diver and team working to inspect the coffer dam for underwater damage caused by flooding. |
Date: | 01 20 1912 |
---|---|
Description: | Elevated view of two men standing on a rail car on the narrow gauge electric railroad crossing the river at the dam construction site. The portion of track... |
Date: | 03 03 1912 |
---|---|
Description: | Two women and a man posing among the timber pilings near the east shore of the river. Wooden concrete forms and two buildings are in the background. |
Date: | 04 13 1912 |
---|---|
Description: | The concrete mixer standing near the newly poured east shore abutment while men are working nearby. Reinforcing rods protrude from the abutment. |
Date: | 04 13 1912 |
---|---|
Description: | Workmen operating a steam shovel loading gravel into electric rail cars during construction of the power dam. |
Date: | 04 12 1912 |
---|---|
Description: | A diver posing with other workmen at the power dam construction site prior to assessing underwater damage. |
Date: | 05 03 1912 |
---|---|
Description: | Workmen on a barge using a pulley to raise sheet steel pilings which were damaged by high water in October, 1911. |
Date: | 05 09 1912 |
---|---|
Description: | Men with shovels working downstream from the east abutment, while other men are looking on. |
Date: | 05 10 1912 |
---|---|
Description: | Work progresses on the wooden concrete forms at the east side of the river. The steam-powered pile drivers are also visible. |
Date: | 05 17 1912 |
---|---|
Description: | Men working from the elevated road on the east end of the power dam, constructing shots (chutes) for the concrete. |
Date: | 05 17 1912 |
---|---|
Description: | Workmen pouring concrete from the elevated railroad into forms below. |
Date: | 05 31 1912 |
---|---|
Description: | Forms have been removed, revealing the newly poured buttresses and apron. A man is pushing a cart on the elevated road. |
Date: | 05 31 1912 |
---|---|
Description: | Workmen posing outside the dining hall before dinner. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: