Date: | 1942 |
---|---|
Description: | Two men talking on a construction site, probably at International Harvester's Bettendorf Tank Arsenal (factory). A pile of bricks is in the foreground alon... |
Date: | 1942 |
---|---|
Description: | A man operates an International crawler tractor (TracTracTor) with a Bucyrus-Erie bulldozer blade inside a factory building. The building is probably Inter... |
Date: | 01 13 1943 |
---|---|
Description: | Factory workers machining torpedo parts at an International Harvester factory. Original caption reads: "This section of the torpedo plant houses a line of ... |
Date: | 01 13 1943 |
---|---|
Description: | A factory worker uses an oxy-acetylene torch to fit a copper tube in the production of an aircraft torpedo. He is wearing an International Harvester Compan... |
Date: | 1942 |
---|---|
Description: | Construction site showing an additional to an International Harvester factory, probably the company's Bettendorf Tank Arsenal. |
Date: | 1941 |
---|---|
Description: | Factory workers on the assembly line (possibly at International Harvester's Ft. Wayne Works) with M-5-6 trucks. Original caption reads: "The trucks are the... |
Date: | 1941 |
---|---|
Description: | Factory workers on an assembly line with M-5-6 trucks, possibly at International Harvester's Ft. Wayne Works. Original caption reads: "The trucks are the m... |
Date: | 1941 |
---|---|
Description: | Factory workers on assembly line with M-5-6 trucks, possibly at International Harvester's Ft. Wayne Works. Original caption reads: "The trucks in the assem... |
Date: | 1941 |
---|---|
Description: | Factory workers move crates containing International M-5-6 trucks onto rail cars, possibly at International Harvester's Ft. Wayne Works. Original caption r... |
Date: | 1941 |
---|---|
Description: | Factory workers packing M-5-6 trucks into crates, possibly at International Harvester's Ft. Wayne Works. Original caption reads: "The trucks in the assembl... |
Date: | 1941 |
---|---|
Description: | Factory workers pack an International M-5-6 truck into a crate, possibly at International Harvester's Ft. Wayne Works. Original caption reads: "The trucks ... |
Date: | 1941 |
---|---|
Description: | Milwaukee Works foremen and supervisors posing in front of a "high-speed, modernized gun carriage." At the right is Superintendent V.A. Guebard, and next t... |
Date: | 1941 |
---|---|
Description: | Factory workers tend to part of a high speed gun carriage at International Harvester's Milwaukee Works. |
Date: | 09 19 1941 |
---|---|
Description: | A group of men and women who have applied for employment at the new St. Paul Works sit around a table. They are being interviewed by representatives of Int... |
Date: | 1941 |
---|---|
Description: | Men and women at drafting tables at International Harvester's St. Paul Works. Original caption reads: "Medium Caliber Artillery Gun Manufacture. The engine... |
Date: | 1941 |
---|---|
Description: | Factory workers unloading a rail car on a loading dock at International Harvester's St. Paul Works. Original caption reads: "Medium Caliber Artillery Gun M... |
Date: | 10 19 1941 |
---|---|
Description: | Workers use an industrial tractor to move factory machinery into place at International Harvester's St. Paul Works. Original caption reads: "Medium Caliber... |
Date: | 1941 |
---|---|
Description: | A job applicant interviews at International Harvester's St. Paul Works. Original caption reads: "Medium Caliber Artillery Gun Manufacture. H.E. Palmer, ind... |
Date: | 09 19 1941 |
---|---|
Description: | Factory workers use a crane mounted on a truck to unload a transformer on the loading dock of International Harvester's St. Paul Works. Original caption re... |
Date: | 09 19 1941 |
---|---|
Description: | Factory superintendent at St. Paul Works. "Medium Caliber Artillery Gun Manufacture. J.E. Harris, left, superintendent of St. Paul Works, confers with M.V.... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: