Date: | 08 04 1926 |
---|---|
Description: | Concrete chimney (model) under construction, U.W. Mining Engineering Building. |
Date: | 01 19 1951 |
---|---|
Description: | University of Wisconsin-Madison Camp Randall Stadium addition, showing north end bleacher re-construction. |
Date: | 01 19 1951 |
---|---|
Description: | University of Wisconsin-Madison Camp Randall Stadium addition, showing north end bleacher re-construction, from the west. |
Date: | 1930 |
---|---|
Description: | Camp Randall Stadium with Field House under construction. |
Date: | 1975 |
---|---|
Description: | View of the construction on the 700 and 800 blocks of State Street, looking west toward Bascom Hill. |
Date: | 1975 |
---|---|
Description: | View of State Street Mall under construction. Visible in the background to the left is the Wisconsin State Historical Society and to the right, the Wiscons... |
Date: | 11 17 1948 |
---|---|
Description: | Construction scene of the new enzyme laboratory at 1710 University Avenue. |
Date: | 1954 |
---|---|
Description: | University of Wisconsin-Madison Bacteriology Building, in process of construction on campus. There are cars in a parking lot in the foreground. |
Date: | 1910 |
---|---|
Description: | Biology building, under construction on the University of Wisconsin-Madison campus. View to the south from the front terrace of Bascom Hall (formerly Main ... |
Date: | 1930 |
---|---|
Description: | Mechanical Engineering Building under construction. A group of construction workers are on the foundation are working near a tower. There is a church steep... |
Date: | 1950 |
---|---|
Description: | Library under construction on the University of Wisconsin-Madison campus. In the background is the State Historical Society, and Science Hall is in the upp... |
Date: | 1951 |
---|---|
Description: | Building under construction on the University of Wisconsin-Madison campus. A small storage area with dirt piles, scattered lumber, and support girders for ... |
Date: | 1925 |
---|---|
Description: | Elevated view of dormitories under construction on the University of Wisconsin-Madison campus. Men are working in different areas on the site. Lake Mendota... |
Date: | 1925 |
---|---|
Description: | Elevated view of dormitories under construction on the University of Wisconsin-Madison campus. The Lake Mendota shoreline is in the background. |
Date: | 05 1898 |
---|---|
Description: | Elevated view over the State Historical Society of Wisconsin building (Wisconsin Historical Society) which is under construction. The Wisconsin State Capit... |
Date: | 06 30 1950 |
---|---|
Description: | Elevated view of construction of new concrete bleachers at the north end of Camp Randall Stadium. |
Date: | 06 30 1950 |
---|---|
Description: | View of the north bleachers at Camp Randall Stadium, with construction started to add additional concrete bleachers on top. |
Date: | 06 1967 |
---|---|
Description: | Composite panoramic view of the south side of the 700 block of State Street. Lake Street parking ramp and University of Wisconsin Extension building are vi... |
Date: | 04 24 1957 |
---|---|
Description: | Bulldozers and steam shovels prepare the site for the future University of Wisconsin Observatory site near Pine Bluff. |
Date: | 09 30 1957 |
---|---|
Description: | Elevated view of the Chadbourne Hall construction site. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: