Date: | 01 10 1939 |
---|---|
Description: | University of Wisconsin Memorial Union Theatre under construction, showing interior with four men on scaffolding. |
Date: | 03 12 1930 |
---|---|
Description: | The University of Wisconsin-Madison Field House frame under construction, with novoid corkboard being installed on the south bleachers of Camp Randall in t... |
Date: | 03 28 1929 |
---|---|
Description: | Men working on the concrete forms for the roof of the addition to the University of Wisconsin hydraulics laboratory, 660 N. Park Street looking north over ... |
Date: | 03 28 1929 |
---|---|
Description: | Elevated view from the south east of men constructing the concrete forms for the roof of the addition to the University of Wisconsin-Madison hydraulics lab... |
Date: | 08 03 1927 |
---|---|
Description: | Service Memorial Institutes, 470 N. Charter Street, University of Wisconsin, 3thir floor under construction. |
Date: | 11 17 1948 |
---|---|
Description: | Construction scene of the new enzyme laboratory at 1710 University Avenue. |
Date: | 1930 |
---|---|
Description: | Mechanical Engineering Building under construction. A group of construction workers are on the foundation are working near a tower. There is a church steep... |
Date: | 1950 |
---|---|
Description: | Library under construction on the University of Wisconsin-Madison campus. In the background is the State Historical Society, and Science Hall is in the upp... |
Date: | 1925 |
---|---|
Description: | Elevated view of dormitories under construction on the University of Wisconsin-Madison campus. Men are working in different areas on the site. Lake Mendota... |
Date: | 06 30 1950 |
---|---|
Description: | Elevated view of construction of new concrete bleachers at the north end of Camp Randall Stadium. |
Date: | 06 30 1950 |
---|---|
Description: | View of the north bleachers at Camp Randall Stadium, with construction started to add additional concrete bleachers on top. |
Date: | 06 1967 |
---|---|
Description: | Composite panoramic view of the south side of the 700 block of State Street. Lake Street parking ramp and University of Wisconsin Extension building are vi... |
Date: | 04 24 1957 |
---|---|
Description: | Bulldozers and steam shovels prepare the site for the future University of Wisconsin Observatory site near Pine Bluff. |
Date: | 09 30 1957 |
---|---|
Description: | Elevated view of the Chadbourne Hall construction site. |
Date: | 09 30 1957 |
---|---|
Description: | Construction site of the University of Wisconsin Holt dormitory on Elm Drive. |
Date: | 1967 |
---|---|
Description: | Elevated view of construction of the T-shaped addition on the Wisconsin Historical Society Headquarters Building, from Science Hall looking southeast. Vehi... |
Date: | 07 27 1965 |
---|---|
Description: | Workers and equipment are shown tearing down old student dwellings to make room for the Elvehjem Art Center complex. It is surrounded by Park Street, Unive... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: