Date: | 1911 |
---|---|
Description: | Elevated view of the Fourth Capitol and dome under construction, while the north wing of the third Wisconsin State Capitol remains standing on the right. T... |
Date: | 1949 |
---|---|
Description: | View of the Johnson Wax Research and Development Tower under construction. |
Date: | 1908 |
---|---|
Description: | The west wing of the third Wisconsin State Capitol on Decoration Day. The steep slope of the western side of the park delayed the construction of the east ... |
Date: | 1915 |
---|---|
Description: | Construction of the north wing of the Wisconsin State Capitol building. |
Date: | 1912 |
---|---|
Description: | The fourth Wisconsin State Capitol during construction of the dome. |
Date: | 1912 |
---|---|
Description: | Wisconsin State Capitol (fourth capitol, third in Madison) under construction. View from South Hamilton Street. |
Date: | 1907 |
---|---|
Description: | The construction of the East Wing of the new Capitol is underway. This is a view of the North and South Wings and the dome of the Third Wisconsin State Cap... |
Date: | 1911 |
---|---|
Description: | View of the construction of the fourth Wisconsin State Capitol. |
Date: | 10 1869 |
---|---|
Description: | The second Wisconsin State Capitol dome under construction, showing the workmen and the equipment they used to hoist construction materials into place. |
Date: | |
---|---|
Description: | Railroad bridge construction at an unknown location somewhere on the Chicago, Milwaukee, and St. Paul Railroad line. There is a church in the background on... |
Date: | 1912 |
---|---|
Description: | Wisconsin State Capitol under construction, with men and a horse-drawn buggy in the foreground. |
Date: | 1914 |
---|---|
Description: | The Wisconsin State Capitol under construction during the summer of 1914. One wing is still under construction and the statue "Wisconsin," by Daniel Cheste... |
Date: | 1891 |
---|---|
Description: | Elevated view of a barn raising on the farm of Alva Paddock in the township of Salem on Geneva Road, Highway 50. |
Date: | 1890 |
---|---|
Description: | Exterior view of the Lincoln School as it approached its completion. Scaffolding is on the roof. |
Date: | 1960 |
---|---|
Description: | View from below looking up towards workers constructing and reinforcing the forms for the footings of the interstate highway bridge at Mirror Lake. |
Date: | 1960 |
---|---|
Description: | Aerial view of the construction of the interstate highway near Mirror Lake, showing only the early stages of the bridge construction. |
Date: | 11 16 1960 |
---|---|
Description: | Elevated view of the interstate highway bridge construction at Mirror Lake showing the concrete footings halfway down the embankment. |
Date: | |
---|---|
Description: | Stereograph view of construction of the Wisconsin State Capitol dome during the construction of the fourth capitol building. Features the Capitol Square si... |
Date: | 1910 |
---|---|
Description: | Biology building, under construction on the University of Wisconsin-Madison campus. View to the south from the front terrace of Bascom Hall (formerly Main ... |
Date: | |
---|---|
Description: | View from below of an overpass structure after completion on US Highway 41, north of Appleton. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: