Date: | 1868 |
---|---|
Description: | The entrance to the third Wisconsin State Capitol before the construction of the dome, showing the park and walkway. Framing for the dome can be seen throu... |
Date: | 1969 |
---|---|
Description: | Several older buildings are visible in the foreground, while the framework of a World Trade Center Tower is visible in the background. |
Date: | 1895 |
---|---|
Description: | Exterior view of the shingle mill near Mellen, with five men, probably employees, posing on and near the outdoor stairway of a building. From bottom to top... |
Date: | 1918 |
---|---|
Description: | View from shoreline of a reinforced railroad bridge over a river. There are stone foundations on both banks supporting the railroad bed. Wood has been stac... |
Date: | 1935 |
---|---|
Description: | Panoramic view of the construction of the Norris Dam, looking upstream. On the left the text reads: "West Bank," and on the right it reads: "East Bank." |
Date: | 08 01 1936 |
---|---|
Description: | Elevated, panoramic view of the Pickwick Dam under construction. |
Date: | 03 24 1937 |
---|---|
Description: | Elevated, panoramic view of the construction of the Pickwick Dam power house and spillway. |
Date: | 05 09 1938 |
---|---|
Description: | View towards the front and right side of the slave cabin built of chinked logs with a peaked roof. Steps lead up to the door, and a small window is on the ... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: