Date: | |
---|---|
Description: | Soldiers and horse-drawn wagons moving to the front. |
Date: | |
---|---|
Description: | Elevated view of a field kitchen on a bad road heading from Sabac to the front. |
Date: | |
---|---|
Description: | Soldiers attempting to repair badly damaged Serbian roads. |
Date: | |
---|---|
Description: | Destroyed telephone lines in Serbia being repaired for use. |
Date: | |
---|---|
Description: | Duties of the Turkish Landsturm (reservists). Moving provisions with wagons pulled by water buffalo. |
Date: | |
---|---|
Description: | Moving provisions with wagons pulled by water buffalo. |
Date: | |
---|---|
Description: | Transporting building lumber to our high altitude fighting positions on the Italian-Tirolian front. |
Date: | |
---|---|
Description: | Flag signal station on a mountain road at Lovcen. Raising the flag signals wagons below to stop. |
Date: | |
---|---|
Description: | Workers repairing a stone viaduct that had been demolished. View of the site of the explosion and the serpentine road. |
Date: | |
---|---|
Description: | Repair work on a stone viaduct on a serpentine road on Mount Lovcen that had been damaged by the Montenegrins. |
Date: | |
---|---|
Description: | Repair work on Mount Lovcen to repair roads. Austrian troops using a rock crusher. |
Date: | |
---|---|
Description: | Repair work on Mount Lovcen to repair roads. Civilians carrying bags of cement up a road to the repair site. |
Date: | |
---|---|
Description: | Our troops marching between Rijeka (Rijeka Crnojevića) and Virpazar in Montenegro. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: