Date: | 10 12 1911 |
---|---|
Description: | High water has scattered timber pilings through the construction camp. The office is on the right; the smokestacks of the temporary power plant are behind ... |
Date: | 07 02 1913 |
---|---|
Description: | Workers pause while installing a maze of conduit for the switchboard in the power house. The construction camp is to the left. |
Date: | |
---|---|
Description: | View down slope towards a man sitting on the shore of a lake beneath a tree, near a rowboat. Another boat is pulled up on the shore nearby. In the backgrou... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: