Date: | 09 30 1912 |
---|---|
Description: | Forms have been removed from the first concrete poured for the power house in the northeast corner of the coffer dam. Men are pouring concrete from rail ca... |
Date: | 06 13 1913 |
---|---|
Description: | A view, from the west, of the quarry on Blackhawk Bluff. Gravel from the quarry was used in concrete for the construction of the power plant and dam. |
Date: | 07 02 1913 |
---|---|
Description: | Workers pause while installing a maze of conduit for the switchboard in the power house. The construction camp is to the left. |
Date: | 11 01 1913 |
---|---|
Description: | Wooden forms are in place for construction of the walls of the lock at the Prairie du Sac dam. The newly constructed power house is on the left. |
Date: | 05 28 1911 |
---|---|
Description: | Men posing on a barge carrying a steam powered pile driver at work on the coffer dam for the construction of the powerhouse. Caption reads: "Driving Sheet ... |